AA Pittsfield Junction Ops

Any historical questions can be posted here. Answers would certainly help as well :)
User avatar
Ypsi
The Bestest Railroadfan... fan
Posts: 5510
Joined: Sun Feb 07, 2010 2:13 pm

AA Pittsfield Junction Ops

Unread post by Ypsi »

While searching for prototype photos of AA 7771 I stumbled to this shot of the unit sitting at Pittsfield junction

http://www.rrpicturearchives.net/showPi ... id=1214034

It shows AA 7771 assigned to switch saline. I recall when they would leave one unit on the branch and have no train, but I don't know how the ops went back then. Now they will switch saline on the NB or SB run.. I was just wondering how the ops worked when they left a unit there. Was it leaving the unit to get the cars when they were ready, or because it was the time When the branch required switching multiple times a day?
"Ann Arbor 2373 Calling... Milkshake. Over"

All Aboard Amtrak: Northbound, Southbound, and My Hometown

User avatar
ns8401
Railroadfan...fan
Posts: 3988
Joined: Tue Aug 14, 2007 1:57 pm
Location: Chicago, IL/Ann Arbor MI
Contact:

Re: AA Pittsfield Junction Ops

Unread post by ns8401 »

YpsiAmtrakBoy wrote:While searching for prototype photos of AA 7771 I stumbled to this shot of the unit sitting at Pittsfield junction

http://www.rrpicturearchives.net/showPi ... id=1214034

It shows AA 7771 assigned to switch saline. I recall when they would leave one unit on the branch and have no train, but I don't know how the ops went back then. Now they will switch saline on the NB or SB run.. I was just wondering how the ops worked when they left a unit there. Was it leaving the unit to get the cars when they were ready, or because it was the time When the branch required switching multiple times a day?
I don't recall them assigning a unit to Saline. I do recall them taking the whole road train down there a few times and leaving the cars on the "main" west of the Ford switch.
Celebrating Over 3800 Posts in HD
This updated Signature Brought To YOU By The One The Only MQT3001!
NS8401, Online, At Trackside And On Your Side

jimnorthwood
Railroadfan...fan
Posts: 413
Joined: Tue Jun 24, 2008 8:05 am
Location: Northwood, OH

Re: AA Pittsfield Junction Ops

Unread post by jimnorthwood »

When I was in grad school at UM (1986 and 1987) I would drive over to Pittsfield Jct if I had time, and knew a train would be running to Saline. I don't recall any specific unit being assigned to Saline, but that doesn't mean anything, as there are plenty of other things that happened nearly 30 years ago that I don't recall. I DO remember that they always used a caboose for the long backup move from Pittsfield Jct to what was then Ford in Saline, which was really cool to watch.

User avatar
AARR
Ann Arbor RR Nerd
Posts: 37842
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: AA Pittsfield Junction Ops

Unread post by AARR »

The Ford plant used to get switched 2x per weekday so I don't know if assigning an engine to the Saline Branch was a regular job or just an occasional move to switch the Ford plant at a specific time when the road train was not able to do so.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

hoborich
Railroadfan...fan
Posts: 2992
Joined: Thu Nov 13, 2008 1:05 am
Location: Northern Michigan

Re: AA Pittsfield Junction Ops

Unread post by hoborich »

More than likely, the Ford plant was switched twice a day, at shift change. Ford uses a just in time supply system. And emptys come out, and loads go in during a short window during shift change.
"Ask your doctor if medical advice from a TV commercial is right for you".

User avatar
AARR
Ann Arbor RR Nerd
Posts: 37842
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: AA Pittsfield Junction Ops

Unread post by AARR »

hoborich wrote:More than likely, the Ford plant was switched twice a day, at shift change. Ford uses a just in time supply system. And emptys come out, and loads go in during a short window during shift change.
Good point, hobo. IIRC the switch times were normally 3pm and 11pm on weekdays.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

User avatar
ns8401
Railroadfan...fan
Posts: 3988
Joined: Tue Aug 14, 2007 1:57 pm
Location: Chicago, IL/Ann Arbor MI
Contact:

Re: AA Pittsfield Junction Ops

Unread post by ns8401 »

AARR wrote:
hoborich wrote:More than likely, the Ford plant was switched twice a day, at shift change. Ford uses a just in time supply system. And emptys come out, and loads go in during a short window during shift change.
Good point, hobo. IIRC the switch times were normally 3pm and 11pm on weekdays.
That sounds about right.. About 10 years ago I would sometimes go down by the plant to watch them switch between 3 and 7.
Celebrating Over 3800 Posts in HD
This updated Signature Brought To YOU By The One The Only MQT3001!
NS8401, Online, At Trackside And On Your Side

GP30M4216
Saver of all History
Posts: 4794
Joined: Wed Oct 27, 2004 10:35 pm
Location: Feel the Zeel, MI
Contact:

Re: AA Pittsfield Junction Ops

Unread post by GP30M4216 »

There's some good info on this thread from days of old: viewtopic.php?f=9&t=23293

User avatar
AARR
Ann Arbor RR Nerd
Posts: 37842
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: AA Pittsfield Junction Ops

Unread post by AARR »

ns8401 wrote:
AARR wrote:
hoborich wrote:More than likely, the Ford plant was switched twice a day, at shift change. Ford uses a just in time supply system. And emptys come out, and loads go in during a short window during shift change.
Good point, hobo. IIRC the switch times were normally 3pm and 11pm on weekdays.
That sounds about right.. About 10 years ago I would sometimes go down by the plant to watch them switch between 3 and 7.
Back in those days they would often switch the Ford plant very early Sunday morning too.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

User avatar
AARR
Ann Arbor RR Nerd
Posts: 37842
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: AA Pittsfield Junction Ops

Unread post by AARR »

This question was posted at the other board. I can't post there but if someone would like to do so this thread would be helpful to him.
https://members4.boardhost.com/OtherMic ... 89560.html
Posted by Alex on 11/23/2021, 12:46 pm
Just curious,

What saved the Saline Branch, in history.

Currently no active customers, just storage and access to an industrial park. 20 years ago +/-, Visteon was an active customer.

But, prior to the Visteon plant as erected, what was the active customer that saved the line? Was there an active elevator in town for years? I can't imagine that the Visteon plant has been around since before the expressways were built.

The ex-NYC has largely been gone for 60+ years, predating bot the the US 23 and I 94 expressways.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

User avatar
AARR
Ann Arbor RR Nerd
Posts: 37842
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: AA Pittsfield Junction Ops

Unread post by AARR »

Posted by NILE on 11/24/2021, 10:50 am, in reply to "Re: Saline Branch - What saved the line"
Currently, there is a short spur off the Saline branch at Industrial Rd. It is behind a company called Flatout INC. I think cars were stored there in the mid-90s, but I don't know what customer every used that spur.
A produce company, Crossett, used that track to unload an occasional refrigerated box car of potatoes or something like that. It seems they received rail service past the year 2000.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

Henry F. Burger
Railroadfan...fan
Posts: 64
Joined: Fri May 30, 2014 7:48 pm

Re: AA Pittsfield Junction Ops

Unread post by Henry F. Burger »

That track was installed at the request of Saline as industrial term track.