I was finally able to get out to Padnos in Howell this afternoon for the first time since their metal shredder became operational this summer after being under construction for nearly three years. I have suspected that they may be having a rail siding for over a year with pink topped stakes being seen alongside the GLC main since the fall of 2022. Today I discovered multiple staking everywhere in the same area. This time on the staking, they were all marked C/L track (centerline) with a couple saying north end of scale and south end of scale.
Not known how many possible tracks or length of tracks, of if there will be a building to house the scale. One thing for sure, this will be built as the land as been cleared with a couple of stakes where electrical poles will have to be relocated. Also not yet known where any of this new scrap rail traffic will go. Just because the CSX trasfer track is not far away does not mean CSX will get the business as it still could go to Watco at Osmer or CN at Durand. Looks as if the switch off the GLC will be for a northbound (west) pick up and set off but the nearby run around track at Cattell Street could easily be used.
The siding will be within one hundred feet south of where the long time short spur near Burger King was uncovered last year with the clearing under electrical lines near Industrial drive. This new spur will be directly behind Livingston County's east complex building and behind Aldi's.
Not known how many possible tracks or length of tracks, of if there will be a building to house the scale. One thing for sure, this will be built as the land as been cleared with a couple of stakes where electrical poles will have to be relocated. Also not yet known where any of this new scrap rail traffic will go. Just because the CSX trasfer track is not far away does not mean CSX will get the business as it still could go to Watco at Osmer or CN at Durand. Looks as if the switch off the GLC will be for a northbound (west) pick up and set off but the nearby run around track at Cattell Street could easily be used.
The siding will be within one hundred feet south of where the long time short spur near Burger King was uncovered last year with the clearing under electrical lines near Industrial drive. This new spur will be directly behind Livingston County's east complex building and behind Aldi's.