Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by dave989 »

Paw Paw is not gonna happen. Lawrence however is part of the plan. If they rehab the crossing at Red Arrow Highway that will cost some $$$. Plus the ROW near Lawrence is still overgrown with weeds and bushes.

User avatar
12Bridge
Railroadfan...fan
Posts: 347
Joined: Thu Feb 26, 2009 7:57 pm
Location: Lake Wazapamani

Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by 12Bridge »

Image

Steve B
Railroadfan...fan
Posts: 1271
Joined: Thu Jul 12, 2007 8:03 pm
Location: East Lansing

Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by Steve B »

GR H & C wrote:
Fri Jun 03, 2022 5:46 pm
In the June 2022 issue of Trains magazine it states that the West Michigan railroad hopes to relay track eastward to directly serve industry. The railroad has stockpiled 9 miles of rail for it.
Would've been easier to restore it if they hadn't abandoned & torn it up in 2013. Is the stockpiled rail to restore that segment the same rail that was pulled up from that segment?? That might be a first!

User avatar
LansingRailFan
Railroadfan...fan
Posts: 11242
Joined: Fri Nov 01, 2019 4:21 pm
Location: Lansing
Contact:

Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by LansingRailFan »

Steve B wrote:
Sat Jun 04, 2022 2:15 pm
GR H & C wrote:
Fri Jun 03, 2022 5:46 pm
In the June 2022 issue of Trains magazine it states that the West Michigan railroad hopes to relay track eastward to directly serve industry. The railroad has stockpiled 9 miles of rail for it.
Would've been easier to restore it if they hadn't abandoned & torn it up in 2013. Is the stockpiled rail to restore that segment the same rail that was pulled up from that segment?? That might be a first!
No. It’s from CSX when they replaced rail on the main.

User avatar
Saturnalia
Authority on Cat
Posts: 15396
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by Saturnalia »

LansingRailFan wrote:
Sat Jun 04, 2022 2:35 pm
Steve B wrote:
Sat Jun 04, 2022 2:15 pm
GR H & C wrote:
Fri Jun 03, 2022 5:46 pm
In the June 2022 issue of Trains magazine it states that the West Michigan railroad hopes to relay track eastward to directly serve industry. The railroad has stockpiled 9 miles of rail for it.
Would've been easier to restore it if they hadn't abandoned & torn it up in 2013. Is the stockpiled rail to restore that segment the same rail that was pulled up from that segment?? That might be a first!
No. It’s from CSX when they replaced rail on the main.
Correct, they got a pile of 122# rail and plates from the contractor scrapping out their rail upgrade project a couple years ago.
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

CAT345C
RedNeck Train Chaser
Posts: 4142
Joined: Sat Jul 30, 2005 8:42 pm
Location: Buffalo Location
Contact:

Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by CAT345C »

dave989 wrote:
Sat Jun 04, 2022 11:29 am
Paw Paw is not gonna happen. Lawrence however is part of the plan. If they rehab the crossing at Red Arrow Highway that will cost some $$$. Plus the ROW near Lawrence is still overgrown with weeds and bushes.
It's not the expensive to rent a mulching head for a skidsteer, there already a D6, off road truck and excavator at the transload in Hartford. Grading the grooming the row is minimal in comparison to the bridge and tie work.
Making the railroad all Catywompus since 2008

https://www.flickr.com/gp/66353741@N07/02EZ1e

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10468
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by SD80MAC »

dave989 wrote:
Sat Jun 04, 2022 11:29 am
Paw Paw is not gonna happen. Lawrence however is part of the plan. If they rehab the crossing at Red Arrow Highway that will cost some $$$. Plus the ROW near Lawrence is still overgrown with weeds and bushes.
Paw Paw isn’t part of this plan.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

User avatar
J T
Hates Supper
Posts: 11371
Joined: Mon Dec 11, 2006 7:23 pm
Location: Grand Rapids
Contact:

Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by J T »

SD80MAC wrote:
Sun Jun 05, 2022 12:52 am
dave989 wrote:
Sat Jun 04, 2022 11:29 am
Paw Paw is not gonna happen. Lawrence however is part of the plan. If they rehab the crossing at Red Arrow Highway that will cost some $$$. Plus the ROW near Lawrence is still overgrown with weeds and bushes.
Paw Paw isn’t part of this plan.
Image
https://www.flickr.com/photos/jimthias/
GRHC - you know every night I can imagine he is in front of his computer screen sitting in his underwear swearing profusely and drinking Blatz beer combing the RailRoadFan website for grammatical errors.

User avatar
LansingRailFan
Railroadfan...fan
Posts: 11242
Joined: Fri Nov 01, 2019 4:21 pm
Location: Lansing
Contact:

Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by LansingRailFan »

J T wrote:
Sun Jun 05, 2022 12:59 am
SD80MAC wrote:
Sun Jun 05, 2022 12:52 am
dave989 wrote:
Sat Jun 04, 2022 11:29 am
Paw Paw is not gonna happen. Lawrence however is part of the plan. If they rehab the crossing at Red Arrow Highway that will cost some $$$. Plus the ROW near Lawrence is still overgrown with weeds and bushes.
Paw Paw isn’t part of this plan.
Image
YES.

Where’s that pic of yours w the Pioneer train running by the cottages?

Dowagiac Train Dude
Railroadfan...fan
Posts: 214
Joined: Thu Apr 22, 2021 11:59 am

Re: Secretary of Transportation to visit LSRC 6/1/2022

Unread post by Dowagiac Train Dude »

I am not sure if this should be posted here or not so Z, please move if it shouldn’t be here.

I thought I would post this here since the article is about the Fruit Belt rail line that used the same tracks that are now being serviced by WMR in Hartford and soon to be Lawrence. I have driven the back way into Mattawan numerous times and have always wondered if the property that the power lines run through was an old railroad bed.

https://wwmt.com/amp/news/local/oshtemo ... -belt-rail