If my sources are correct, there should be a partial re-timbering happening on the Plymouth subdivision sometime this year.
Plymouth & GR sub-div Work
- David Collins
- Train Paparazzi
- Posts: 2987
- Joined: Fri Sep 25, 2020 10:46 am
- Location: Bloomfield Hills, Mi
- Contact:
Re: Plymouth & GR sub-div Work
Ferris State University’s Train Guy
Youtube: Michigan Railfan Films
Flickr: David R. Collins
Snapchat: daveeed1k
Youtube: Michigan Railfan Films
Flickr: David R. Collins
Snapchat: daveeed1k
-
- Railroadfan...fan
- Posts: 2759
- Joined: Mon May 09, 2022 7:01 pm
- Location: West Michigan
- Contact:
Re: Plymouth & GR sub-div Work
I believe there are some ties heading to a business in Livingston. M327 has been dropping off loaded cars with ties there recently
Average railfan reporter on Grand Rapids Sub, Plymouth Sub, and Area Short Lines Railroads.
Follow my channel for more: https://www.youtube.com/@ATARP24
Follow my channel for more: https://www.youtube.com/@ATARP24
Re: Plymouth & GR sub-div Work
Lots of ties spread out on the line from St. Joe bridge to well south of Livingston. M327 set out tie cars in Michigan City today. They’ve dumped ballast from the Saugatuck Hill area to well south of St. Joe. So the project is quite significant on the GR sub. Was curious if the same is happening on the Plymouth.
- Saturnalia
- Authority on Cat
- Posts: 15431
- Joined: Wed Sep 28, 2011 7:54 pm
- Location: Michigan City, IN
- Contact:
Re: Plymouth & GR sub-div Work
Ties were distributed along the ROW today in Michigan City.
-
- Railroadfan...fan
- Posts: 2759
- Joined: Mon May 09, 2022 7:01 pm
- Location: West Michigan
- Contact:
Re: Plymouth & GR sub-div Work
W085-14 (Loaded Ballast Train) set to dump ballast from mp 44 to all the way Grandville mp 6.0 today
Average railfan reporter on Grand Rapids Sub, Plymouth Sub, and Area Short Lines Railroads.
Follow my channel for more: https://www.youtube.com/@ATARP24
Follow my channel for more: https://www.youtube.com/@ATARP24
Re: Plymouth & GR sub-div Work
In a local group on Facebook many people were posting about isbell bridge and how they wish it could be fixed up. Made me think, with all the work they're doing on the Plymouth sub when they reach Howell will they finally take down Isbell bridge? I know at one point CSX wanted to take the bridge down. When the time comes a lot of people will definitely be bummed out, even non train people it seems.
Re: Plymouth & GR sub-div Work
there is the (historical)issue of pedestrian access.
mdot removed the original pedestrian bridge across I-696 to harrison high school and had no plans to replace it.
the replacement bridge lives on while the high school closed and is now a community center.
mdot removed the original pedestrian bridge across I-696 to harrison high school and had no plans to replace it.
the replacement bridge lives on while the high school closed and is now a community center.
- MQT1223
- O Scale Railfanner
- Posts: 4134
- Joined: Wed Sep 10, 2014 1:46 pm
- Location: Grandville, Michigan
- Contact:
Re: Plymouth & GR sub-div Work
Looks like the searchlights in Webberville have been removed, I didn’t see them when I was there on Monday. Anyone know if any other signals east of Lansing have come down?
1223 OUT! President and Founder of the Buck Creek Central, the Rolling River Route! (2012-2017) President and Founder of the Lamberton Valley Railroad, The Tin Plate Road! Proudly railfanning with Asperger's since 1996. ![Smile :)](https://railroadfan.com/phpbb/images/smilies/icon_smile.gif)
![Smile :)](https://railroadfan.com/phpbb/images/smilies/icon_smile.gif)
Re: Plymouth & GR sub-div Work
Zimmer and Williamston were still there untouched when I was there Monday. I thought the current project was just between Trowbridge and Williamston?
- MQT1223
- O Scale Railfanner
- Posts: 4134
- Joined: Wed Sep 10, 2014 1:46 pm
- Location: Grandville, Michigan
- Contact:
Re: Plymouth & GR sub-div Work
I might’ve just not seen them, but that’s why I was looking for confirmation
1223 OUT! President and Founder of the Buck Creek Central, the Rolling River Route! (2012-2017) President and Founder of the Lamberton Valley Railroad, The Tin Plate Road! Proudly railfanning with Asperger's since 1996. ![Smile :)](https://railroadfan.com/phpbb/images/smilies/icon_smile.gif)
![Smile :)](https://railroadfan.com/phpbb/images/smilies/icon_smile.gif)
Re: Plymouth & GR sub-div Work
As of now, no signals have been removed. Current slice of action will see Trowbridge to EE Williamston redone sometime in the near future. New locations for signals by CH 76.4 and CH 80.0 for the apparent 2 intermediates between the sidings.
Just a Fat Guy
Re: Plymouth & GR sub-div Work
Also, ties have begun to be set out on the Plymouth Sub between Howell and Williamston, including the siding at Fowlerville. Empty tie Gons spotted at the EE of Williamston siding, Brandt truck and tie handler were parked in the old Williamston house track by the west end.
Just a Fat Guy
Re: Plymouth & GR sub-div Work
So where is CH 76.4? Between Meridian and Burkley Rds?
-
- Railroadfan...fan
- Posts: 1947
- Joined: Fri Sep 25, 2020 12:48 pm
Re: Plymouth & GR sub-div Work
It's basically Burkley Rd itself. 76.42 (crossing plaque) / 76.43 (bungalow)
Casual railfan who frequents the CN Flint + CSX Plymouth subs
- Doktor No
- Railroadfan...fan
- Posts: 1085
- Joined: Wed Feb 04, 2015 4:49 pm
- Location: Rockford, Michigan
Re: Plymouth & GR sub-div Work
And as I have been informed by an employee, the tie gang will work nights from 11 to 7ish. Thusly no trains effected very much. All subject to the vagaries of railroad logic though.
Curb Your Enthusiasm.
Re: Plymouth & GR sub-div Work
Track gang will unload and start working tonight east from Williamston siding.
Just a Fat Guy
-
- Railroadfan...fan
- Posts: 3
- Joined: Sat Nov 11, 2023 2:22 pm
- Location: Grand Haven, MI
- Contact:
Re: Plymouth & GR sub-div Work
Fowlerville siding out of service do to MoW repairing a rail.
The railfan who is barefoot
Re: Plymouth & GR sub-div Work
The Coast Guard has this item in the Local Notice to Mariners:
From July 8 through August 16, 2024, between the hours of 0600 and 1800, Monday through Saturday, a 50-foot by 80-foot barge will be performing maintenance to the CSX Railroad Bridge at mile 0.67 over the Saint Joseph River. The barge will move to accommodate vessel traffic if a 2-hour advance notice is provided directly to the barge on VHF-FM Marine Channel 16
I haven’t been listening to the scanner today, so I don’t know if said barge has begun work. That’s a long period of work, so it will be interesting to see what they are undertaking.
From July 8 through August 16, 2024, between the hours of 0600 and 1800, Monday through Saturday, a 50-foot by 80-foot barge will be performing maintenance to the CSX Railroad Bridge at mile 0.67 over the Saint Joseph River. The barge will move to accommodate vessel traffic if a 2-hour advance notice is provided directly to the barge on VHF-FM Marine Channel 16
I haven’t been listening to the scanner today, so I don’t know if said barge has begun work. That’s a long period of work, so it will be interesting to see what they are undertaking.
- SD80MAC
- Ingersoll's Mr. Michigan
- Posts: 10614
- Joined: Thu Mar 10, 2005 4:59 pm
- Location: Grand Rapids
Re: Plymouth & GR sub-div Work
Getting the bridge ready to remote it.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
![Image](http://flickriver.com/badge/user/all/interesting/shuffle/medium-horiz/ffffff/333333/56692108@N03.jpg)
http://flickriver.com/photos/conrail680 ... teresting/
![Image](http://flickriver.com/badge/user/all/interesting/shuffle/medium-horiz/ffffff/333333/56692108@N03.jpg)
Re: Plymouth & GR sub-div Work
As of June 24th the signals at CH 67 (which I believe are the signals that crews call as "Webberville") are still standing, I will include a picture below. Earlier this year, I had asked about the next set west, and was told they had been the newer Safetran "vader" style for a few years now.MQT1223 wrote: ↑Thu Jun 13, 2024 6:45 pmI might’ve just not seen them, but that’s why I was looking for confirmation
While I was out there (this was when W084-19 made its westward trip) I could see red and orange spray-painted markings denoting the wire placements between and nearby the tracks. I will include a picture of those as well.
Currently, severe flooding has affected the MSU campus, lots of videos going around in my circles. From what I can see the worst of it is near the Frandor area which seems to have a similar elevation to the area around the Trowbridge diamond.
Considering the local (to Brighton) CSX signaling system does not like the rain, I wonder how this will affect the system, or even if it could warrant the replacement of the Trowbridge area searchlights.
As of 22:20 07/09, CN is lining trains thru Trowbridge, with even the Okemos-Trowbridge "dead zone" working on ATCS.