E&W to rebuild connection with former GT in Mishawaka
- MQT1223
- O Scale Railfanner
- Posts: 4243
- Joined: Wed Sep 10, 2014 1:46 pm
- Location: Grandville, Michigan
- Contact:
E&W to rebuild connection with former GT in Mishawaka
https://www.facebook.com/share/p/A4nNoDACq2DbFK5w/?
Sounds like the E&W in Elkhart is planning on relaying/rebuilding around 5 miles of track to connect into the CN so that way they can have access to not just NS. Curious how this will affect them long term and if this means they have something lined up with CN
Sounds like the E&W in Elkhart is planning on relaying/rebuilding around 5 miles of track to connect into the CN so that way they can have access to not just NS. Curious how this will affect them long term and if this means they have something lined up with CN
1223 OUT! President and Founder of the Buck Creek Central, the Rolling River Route! (2012-2017) President and Founder of the Lamberton Valley Railroad, The Tin Plate Road! Proudly railfanning with Asperger's since 1996.
- ~Z~
- Sofa King Admin
- Posts: 13237
- Joined: Tue Oct 12, 2004 2:14 pm
- Location: Grand Rapids, MI
- Contact:
Re: E&W to rebuild connection with former GT in Mishawaka
Have a linky for those without facebook accounts, and better yet, people that aren't a member of the private 174 member group?
Webmaster
Railroad photos on Railroadfan.com
Railroad photos on Railroadfan.com
Re: E&W to rebuild connection with former GT in Mishawaka
The following is on page 11 of this FRA PDF, published yesterday. Don't see how the amount comes close to rebuilding 5 miles though. Maybe E&W will actually get NS rights to Mishawaka and then build a shorter connection to CN?
https://tinyurl.com/y6axdfpz
St. Joseph County Capital Avenue Corridor Rail Expansion Project (Up to $772,800)
St. Joseph County, Indiana
The proposed project was selected for Project Development and includes extension of the existing Patriot Rail
Elkhart and Western Railroad to connect with Canadian National Railway’s Chicago-Toronto. The project aligns
with the selection criteria by advancing economic opportunities to ship goods by rail, benefitting the customers of
Elkhart and Western Railroad with two Class I connections. St. Joseph’s County and EWR will contribute the 20
percent non-Federal match. The project qualifies for the statutory set-aside for projects in Rural Areas.
- ~Z~
- Sofa King Admin
- Posts: 13237
- Joined: Tue Oct 12, 2004 2:14 pm
- Location: Grand Rapids, MI
- Contact:
Re: E&W to rebuild connection with former GT in Mishawaka
No kidding on the costs. Some of the ROW looks decent to get through, except for the western-most 1 mile. Some grade crossings to be put back in on busy roads, but that last mile has a lot of buildings all over the ROW.
If anything, curve the tracks at route 331, parallel the road and go along the electric ROW to connect to CN north of Mishawaka.
Webmaster
Railroad photos on Railroadfan.com
Railroad photos on Railroadfan.com
- AARR
- Incognito and Irrelevant
- Posts: 39309
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: E&W to rebuild connection with former GT in Mishawaka
Is there enough traffic to justify the cost? How often is service, twice a week?
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
- LansingRailFan
- Pabst Peddler
- Posts: 12306
- Joined: Fri Nov 01, 2019 4:21 pm
- Location: Lansing
- Contact:
Re: E&W to rebuild connection with former GT in Mishawaka
CN also is almost done connecting to the Kingsbury Industrial Park via the trackage that goes to the Kingsbury Elevator.
- justalurker66
- Railroadfan...fan
- Posts: 2018
- Joined: Tue Feb 15, 2011 2:51 am
Re: E&W to rebuild connection with former GT in Mishawaka
North from the end of the line to CN next to Capital Ave.
- Erroneous Monk
- Railroadfan...fan
- Posts: 302
- Joined: Sat Dec 30, 2023 1:35 pm
- Location: The Water Tower
Re: E&W to rebuild connection with former GT in Mishawaka
Maybe the $772,800 is St. Joseph's 20% match? If so that'd bring total costs to $3,864,000.Steve B wrote: ↑Wed Oct 30, 2024 7:52 amThe following is on page 11 of this FRA PDF, published yesterday. Don't see how the amount comes close to rebuilding 5 miles though. Maybe E&W will actually get NS rights to Mishawaka and then build a shorter connection to CN?
https://tinyurl.com/y6axdfpz
St. Joseph County Capital Avenue Corridor Rail Expansion Project (Up to $772,800)
St. Joseph County, Indiana
The proposed project was selected for Project Development and includes extension of the existing Patriot Rail
Elkhart and Western Railroad to connect with Canadian National Railway’s Chicago-Toronto. The project aligns
with the selection criteria by advancing economic opportunities to ship goods by rail, benefitting the customers of
Elkhart and Western Railroad with two Class I connections. St. Joseph’s County and EWR will contribute the 20
percent non-Federal match. The project qualifies for the statutory set-aside for projects in Rural Areas.
- LansingRailFan
- Pabst Peddler
- Posts: 12306
- Joined: Fri Nov 01, 2019 4:21 pm
- Location: Lansing
- Contact:
Re: E&W to rebuild connection with former GT in Mishawaka
The suggested route looks to curve to the north on the east side of US 331 right here: https://maps.app.goo.gl/PmuuRzh9tLbLJf4p6~Z~ wrote: ↑Wed Oct 30, 2024 8:17 amNo kidding on the costs. Some of the ROW looks decent to get through, except for the western-most 1 mile. Some grade crossings to be put back in on busy roads, but that last mile has a lot of buildings all over the ROW.
If anything, curve the tracks at route 331, parallel the road and go along the electric ROW to connect to CN north of Mishawaka.
They'd connect to the CN where US 331 crosses CN.
Re: E&W to rebuild connection with former GT in Mishawaka
The map I found online seems to show what LRF has suggested. The line will extend from the current end of the tracks at Current Rd, cross Current Rd and run alongside Perry Auto, as indicated on the map LRF posted. It will then turn and head north, running alongside 331 until it reaches the CN tracks north of town. It looks like only a few crossings would need to be reinstalled on the line, the Current Rd crossing, the Day Rd crossing and the Douglass Rd crossing, as well as at least 1 crossing accessing the AEP powerstation.
Re: E&W to rebuild connection with former GT in Mishawaka
Looks like there's an industrial spur that runs to behind WestRock. I wonder if that is perhaps the target. The route paralleling 331 is labeled as the alternate. Those of you who are far more familiar with the logistics involved may be able to shed some light on this.
https://maps.app.goo.gl/fDYk4u8dGjsQKUAP6
https://maps.app.goo.gl/fDYk4u8dGjsQKUAP6
Trails to Rails. Put the track back.
- justalurker66
- Railroadfan...fan
- Posts: 2018
- Joined: Tue Feb 15, 2011 2:51 am
-
- Railroadfan...fan
- Posts: 28
- Joined: Sat Jun 11, 2022 5:44 pm
Re: E&W to rebuild connection with former GT in Mishawaka
That will doom the South Shore Line in the industrial park. There are what, just two customers besides car storage?LansingRailFan wrote: ↑Wed Oct 30, 2024 10:02 amCN also is almost done connecting to the Kingsbury Industrial Park via the trackage that goes to the Kingsbury Elevator.
-
- Railroadfan...fan
- Posts: 28
- Joined: Sat Jun 11, 2022 5:44 pm
Re: E&W to rebuild connection with former GT in Mishawaka
Does that WestRock plant even still get rail service? Over the years looking at Google imagery I have never seen freight cars on that spur.Jim_c wrote: ↑Fri Nov 01, 2024 8:00 pmLooks like there's an industrial spur that runs to behind WestRock. I wonder if that is perhaps the target. The route paralleling 331 is labeled as the alternate. Those of you who are far more familiar with the logistics involved may be able to shed some light on this.
https://maps.app.goo.gl/fDYk4u8dGjsQKUAP6
- LansingRailFan
- Pabst Peddler
- Posts: 12306
- Joined: Fri Nov 01, 2019 4:21 pm
- Location: Lansing
- Contact:
Re: E&W to rebuild connection with former GT in Mishawaka
Lots of rumblings about the CSS anywho soSecondCreek wrote: ↑Tue Nov 05, 2024 6:37 pmThat will doom the South Shore Line in the industrial park. There are what, just two customers besides car storage?LansingRailFan wrote: ↑Wed Oct 30, 2024 10:02 amCN also is almost done connecting to the Kingsbury Industrial Park via the trackage that goes to the Kingsbury Elevator.
- MQT1223
- O Scale Railfanner
- Posts: 4243
- Joined: Wed Sep 10, 2014 1:46 pm
- Location: Grandville, Michigan
- Contact:
Re: E&W to rebuild connection with former GT in Mishawaka
In terms of what?LansingRailFan wrote: ↑Tue Nov 05, 2024 6:47 pmLots of rumblings about the CSS anywho soSecondCreek wrote: ↑Tue Nov 05, 2024 6:37 pmThat will doom the South Shore Line in the industrial park. There are what, just two customers besides car storage?LansingRailFan wrote: ↑Wed Oct 30, 2024 10:02 amCN also is almost done connecting to the Kingsbury Industrial Park via the trackage that goes to the Kingsbury Elevator.
1223 OUT! President and Founder of the Buck Creek Central, the Rolling River Route! (2012-2017) President and Founder of the Lamberton Valley Railroad, The Tin Plate Road! Proudly railfanning with Asperger's since 1996.
Re: E&W to rebuild connection with former GT in Mishawaka
No they do not. I have always wondered why they stopped using rail. That plant was originally a Smurfit-Stone plant, and it appears the tracks stopped seeing use after they were acquired by Rock-Tenn in 2011.SecondCreek wrote: ↑Tue Nov 05, 2024 6:41 pmDoes that WestRock plant even still get rail service? Over the years looking at Google imagery I have never seen freight cars on that spur.Jim_c wrote: ↑Fri Nov 01, 2024 8:00 pmLooks like there's an industrial spur that runs to behind WestRock. I wonder if that is perhaps the target. The route paralleling 331 is labeled as the alternate. Those of you who are far more familiar with the logistics involved may be able to shed some light on this.
https://maps.app.goo.gl/fDYk4u8dGjsQKUAP6
Yep, Precoat Metals and Alexander Chemical.SecondCreek wrote: ↑Tue Nov 05, 2024 6:37 pmThat will doom the South Shore Line in the industrial park. There are what, just two customers besides car storage?LansingRailFan wrote: ↑Wed Oct 30, 2024 10:02 amCN also is almost done connecting to the Kingsbury Industrial Park via the trackage that goes to the Kingsbury Elevator.