CN Derailment in Port Huron Tunnel

Anything pertaining to railfanning in Michigan.
Super Chief
Railroadfan...fan
Posts: 1191
Joined: Sat May 26, 2012 9:53 am
Location: Three Rivers, Mi.--Indian Rocks Beach,Fl.

CN Derailment in Port Huron Tunnel

Unread post by Super Chief »

WWMT Reporting 40 cars derailed inside CNs tunnel under the St. Clair river. Trackage also torn up on the Pt. Huron side.

hoborich
Railroadfan...fan
Posts: 2992
Joined: Thu Nov 13, 2008 1:05 am
Location: Northern Michigan

Re: CN Derailment in Port Huron Tunnel

Unread post by hoborich »

Gonna be hard working in that confined space.
Looks like a lot of traffic will be going up the Holly for a few days.
"Ask your doctor if medical advice from a TV commercial is right for you".

User avatar
NS3322
Railroadfan...fan
Posts: 1255
Joined: Sun Nov 08, 2015 12:08 pm
Location: CP-LEVITT

Re: CN Derailment in Port Huron Tunnel

Unread post by NS3322 »

Bridge collapse north of Battle Creek, now this. 2019 has not been a good year for CN (at least in Michigan).

Supposedly 13,700 gallons of sulfuric acid spilled in the tunnel.

User avatar
DaveO
Read more, think more, post less
Posts: 1453
Joined: Thu Dec 14, 2017 12:57 pm
Location: Between here and there

Re: CN Derailment in Port Huron Tunnel

Unread post by DaveO »

NS3322 wrote:Bridge collapse north of Battle Creek, now this. 2019 has not been a good year for CN (at least in Michigan).

Supposedly 13,700 gallons of sulfuric acid spilled in the tunnel.
I saw reports about a small spill. If it is really that much, the clean-up will be long and nasty.

Edit to add, I have read a more recent story about the spill. 13,700 gallons of concentrated sulfuric acid has leaked out of a tank car.

User avatar
trainjunkie47
Railroadfan...fan
Posts: 1692
Joined: Tue Oct 24, 2006 11:38 pm
Location: Westland, MI

Re: CN Derailment in Port Huron Tunnel

Unread post by trainjunkie47 »

Since they can't run double stacks through the Detroit River tunnel, where would the reroute of 148 and 149 go? Buffalo and across CSX?

User avatar
DaveO
Read more, think more, post less
Posts: 1453
Joined: Thu Dec 14, 2017 12:57 pm
Location: Between here and there

Re: CN Derailment in Port Huron Tunnel

Unread post by DaveO »

trainjunkie47 wrote:Since they can't run double stacks through the Detroit River tunnel, where would the reroute of 148 and 149 go? Buffalo and across CSX?
The shaved tunnel can do 8'6" double stacks. Just don't throw in a 9'6" high cube container because that won't work.

Super Chief
Railroadfan...fan
Posts: 1191
Joined: Sat May 26, 2012 9:53 am
Location: Three Rivers, Mi.--Indian Rocks Beach,Fl.

Re: CN Derailment in Port Huron Tunnel

Unread post by Super Chief »

Supposedly there was a DPU on this land barge running east with a Canadian crew. Don't know how many units were pulling but maybe push came to shove and all hell broke loose.

User avatar
Burb8145
Railroadfan...fan
Posts: 463
Joined: Tue Jul 30, 2013 2:08 pm
Location: In the Y&.

Re: CN Derailment in Port Huron Tunnel

Unread post by Burb8145 »

Per On Sheet Southern Ontario on Facebook:
384-385 look to be Niagara routes as 332-333.

fwd: M36731 28 (M39731 28) ordered at Mac Yard for 1815 with CN 2918-CN 3064, planned to detour via CP between Windsor and Detroit and then head back onto home rails via Pontiac and Durand to Kirk Yard. M36731 29 and M36731 30 are also planned.

M36531 29 and M36531 30 (M385) are planned to run ex Mac Yard to Flat Rock via CP between Windsor and Detroit.

Q12731 29 (Q14921 29) is planned to run ex BIT tomorrow evening via Buffalo and Walbridge to Chicago via Detroit, Pontiac and Durand.

Q12291 28, Q12291 29 and Q12291 30 (Q148) are planned to run Chicago to Montreal via Durand, Pontiac, Toledo and Buffalo.

M35491 28 (M394) is ordered at Kirk Yard for 1915 to take a massive detour via Winnipeg to get to Toronto.

Other trains added into CN's Transportation Service Plan for the derailment but aren't planned to run yet include;

M32061 (Flat Rock-Toronto via CP Windsor)
M32491 (Kirk Yard-Toronto via CP Windsor - M394)
M32691 (Kirk Yard-Sarnia via CP Windsor and London - odd)
M32891 (Kirk Yard-Toronto via CP Windsor - M398)
M33261 (Flat Rock-Port Robinson via NS Airline Jct and Buffalo)
M33331 (Port Robinson-Battle Creek via NS Buffalo and Airline Jct)
M33461 (Flat Rock-Toronto via CSXT Walbridge and Buffalo)
M36931 (Mac Yard to Salem via CP Windsor - M399)
If the women don't find you handsome, they should at least find you handy.
-Red Green

CAT345C
RedNeck Train Chaser
Posts: 4141
Joined: Sat Jul 30, 2005 8:42 pm
Location: Buffalo Location
Contact:

Re: CN Derailment in Port Huron Tunnel

Unread post by CAT345C »

Reroute it all via gladstone....
Making the railroad all Catywompus since 2008

https://www.flickr.com/gp/66353741@N07/02EZ1e

chapmaja
Railroadfan...fan
Posts: 1261
Joined: Sat Nov 22, 2008 2:02 pm

Re: CN Derailment in Port Huron Tunnel

Unread post by chapmaja »

Burb8145 wrote:Per On Sheet Southern Ontario on Facebook:

M35491 28 (M394) is ordered at Kirk Yard for 1915 to take a massive detour via Winnipeg to get to Toronto.
I wonder why they are going via Winnipeg rather than through the UP. I would think going through the UP to SSM then up to the trans-Canada mainline would make sense. Is CN so crew tight in the UP that they would not be able to run that train vai the UP?

User avatar
DaveO
Read more, think more, post less
Posts: 1453
Joined: Thu Dec 14, 2017 12:57 pm
Location: Between here and there

Re: CN Derailment in Port Huron Tunnel

Unread post by DaveO »

chapmaja wrote:
Burb8145 wrote:Per On Sheet Southern Ontario on Facebook:

M35491 28 (M394) is ordered at Kirk Yard for 1915 to take a massive detour via Winnipeg to get to Toronto.
I wonder why they are going via Winnipeg rather than through the UP. I would think going through the UP to SSM then up to the trans-Canada mainline would make sense. Is CN so crew tight in the UP that they would not be able to run that train vai the UP?
I think there is a weight restriction on the canal bridges that might be an issue?

jrgerber
Railroadfan...fan
Posts: 518
Joined: Fri Jul 01, 2011 5:03 am

Re: CN Derailment in Port Huron Tunnel

Unread post by jrgerber »

According to the Port Huron newspaper Times Herald
they hope to reopen the tunnel today

GTWChris
Railroadfan...fan
Posts: 2982
Joined: Tue Jul 28, 2009 3:42 pm

Re: CN Derailment in Port Huron Tunnel

Unread post by GTWChris »

jrgerber wrote:According to the Port Huron newspaper Times Herald
they hope to reopen the tunnel today
I believe the goal for today was to finish the cleanup of the sulfuric acid. Once the sulfuric acid is pumped out, the remaining cars can be removed. There is lots of infrastructure work to be done once the remaining cars are removed.

User avatar
Doktor No
Railroadfan...fan
Posts: 1076
Joined: Wed Feb 04, 2015 4:49 pm
Location: Rockford, Michigan

Re: CN Derailment in Port Huron Tunnel

Unread post by Doktor No »

CAT345C wrote:Reroute it all via gladstone....
Crew availability would be the reason. Only so many trains up there and only so many crews for what they have. Anything extra would put a real crimp on things IMHO.
Curb Your Enthusiasm.

JoJames
Railroadfan...fan
Posts: 733
Joined: Sat Oct 09, 2010 10:21 pm
Location: Hamler Ohio

Re: CN Derailment in Port Huron Tunnel

Unread post by JoJames »

Lots of damage inside the tunnel from the DPU pushing cars into the ceiling and the sulphuric acid.

Super Chief
Railroadfan...fan
Posts: 1191
Joined: Sat May 26, 2012 9:53 am
Location: Three Rivers, Mi.--Indian Rocks Beach,Fl.

Re: CN Derailment in Port Huron Tunnel

Unread post by Super Chief »

They were darn lucky the ceiling in the tunnel held then. Imagine the mess they would have had if the river and sulfuric acid started coming out of both sides of the tunnel combined? Since the tunnel has grades on both sides I'm surprised a DPU would be allowed on any train in there. Wouldn't the tunnel itself restrict the signal from the head end to the DPU? I'll bet the playbook gets rewritten.

JoJames
Railroadfan...fan
Posts: 733
Joined: Sat Oct 09, 2010 10:21 pm
Location: Hamler Ohio

Re: CN Derailment in Port Huron Tunnel

Unread post by JoJames »

Super Chief wrote:They were darn lucky the ceiling in the tunnel held then. Imagine the mess they would have had if the river and sulfuric acid started coming out of both sides of the tunnel combined? Since the tunnel has grades on both sides I'm surprised a DPU would be allowed on any train in there. Wouldn't the tunnel itself restrict the signal from the head end to the DPU? I'll bet the playbook gets rewritten.
I think your on to something what caused the derailment.

hoborich
Railroadfan...fan
Posts: 2992
Joined: Thu Nov 13, 2008 1:05 am
Location: Northern Michigan

Re: CN Derailment in Port Huron Tunnel

Unread post by hoborich »

I'm surprised a DPU would be allowed on any train in there.
I'm sure they are rethinking that idea. Land barges could be pulled through in sections and recombined on the other side.

Just a thought here. Does anyone know if the DPU was actually in the tunnel when it occurred, or still out on the canadian side? They would have to uncouple and back out, or walk out, when it happened.
"Ask your doctor if medical advice from a TV commercial is right for you".

GreatLakesRailfan
Railroadfan...fan
Posts: 4828
Joined: Wed Aug 24, 2005 12:28 am
Location: Marysville, Michigan

Re: CN Derailment in Port Huron Tunnel

Unread post by GreatLakesRailfan »

hoborich wrote:
I'm surprised a DPU would be allowed on any train in there.
I'm sure they are rethinking that idea. Land barges could be pulled through in sections and recombined on the other side.

Just a thought here. Does anyone know if the DPU was actually in the tunnel when it occurred, or still out on the canadian side? They would have to uncouple and back out, or walk out, when it happened.
They dragged the DPU out at some point Monday afternoon, from what was posted on Facebook.

It was also posted on Facebook that the only track remaining in the tunnel is the first 2,000 feet or so from the Port Huron entrance. The rest has to be completely replaced.


I remember being surprised to see DPUs show up a couple years ago. At first it was only a couple trains with them (398 I think was the first). I've seen them a little more frequently lately, but most trains I see through the tunnel have had all the power on the front of the train.

It'll be interesting to see the TSB report in a couple years to see what role the DPU played in this event.
~ Charles W.

Steve B
Railroadfan...fan
Posts: 1255
Joined: Thu Jul 12, 2007 8:03 pm
Location: East Lansing

Re: CN Derailment in Port Huron Tunnel

Unread post by Steve B »

Which agency does the investigation and report-- NTSB or Transport Canada-- depends on whether the accident started in Ontario or Michigan. This isn't clear yet, or at least hasn't been made public.

Post Reply