I concur with NSSD70ACe's observation.

I too have been by there. Tracks in place, but no additional activity that I can tell at this time.

Maybe something will change as we move closer to spring, but if this stone yard was really coming quickly, I would not think winter would be holding it up. Maybe I'm wrong, but we will see.

Gravel trains (trucks) can't run now anyway due to seasonal road weight restrictions correct?

David Lang

1TrackMind
Railroadfan...fan
Posts: 222
Joined: Thu May 24, 2018 5:47 pm

Re: GDLK Operations

Unread post by 1TrackMind »

Last I heard it will be march/april before the first train rolls in.

User avatar
12Bridge
Railroadfan...fan
Posts: 347
Joined: Thu Feb 26, 2009 7:57 pm
Location: Lake Wazapamani

Re: GDLK Operations

Unread post by 12Bridge »

Stone typically does not move this time of year anyway, as you cant unload it if it freezes.

User avatar
Ben Higdon
Railroadfan...fan
Posts: 843
Joined: Wed Jan 25, 2006 2:02 pm

Re: GDLK Operations

Unread post by Ben Higdon »

I checked out flashearth to see if their imagery showed the stone yard development in Kalamazoo (it doesn't) and happened to notice something odd - there is a train on the NYC North just north of Patterson. Guessing it is stopped due to the proximity to the grade crossing. It has two units at the south end, and about thirty cars, almost all boxcars with six center beams at the end...clearly not local traffic for the north side of Kalamazoo. Has anyone seen or heard of them stashing a train up there? Perhaps its the turn from Grand Rapids and they didn't have room in Botsford. The yard only has four empty tracks in the imagery...if a few of those were out of service I could see them needing to put the train somewhere else to make room for the NS job from Battle Creek or a turn arriving from Elkhart. Or maybe its the south local and they backed it up there to allow a turn from Elkhart to clear BO before going south.

https://zoom.earth/#42.304667,-85.575849,17z,sat

chapmaja
Railroadfan...fan
Posts: 1261
Joined: Sat Nov 22, 2008 2:02 pm

Re: GDLK Operations

Unread post by chapmaja »

Ben Higdon wrote:I checked out flashearth to see if their imagery showed the stone yard development in Kalamazoo (it doesn't) and happened to notice something odd - there is a train on the NYC North just north of Patterson. Guessing it is stopped due to the proximity to the grade crossing. It has two units at the south end, and about thirty cars, almost all boxcars with six center beams at the end...clearly not local traffic for the north side of Kalamazoo. Has anyone seen or heard of them stashing a train up there? Perhaps its the turn from Grand Rapids and they didn't have room in Botsford. The yard only has four empty tracks in the imagery...if a few of those were out of service I could see them needing to put the train somewhere else to make room for the NS job from Battle Creek or a turn arriving from Elkhart. Or maybe its the south local and they backed it up there to allow a turn from Elkhart to clear BO before going south.

https://zoom.earth/#42.304667,-85.575849,17z,sat

Train from Otsego maybe? Boxcars would be something they would have. Looking at the yard, I don't see a lot of room to put anything else in the yard.

Jim_c
Railroadfan...fan
Posts: 311
Joined: Sun Apr 09, 2017 6:14 pm

Re: GDLK Operations

Unread post by Jim_c »

chapmaja wrote:
Ben Higdon wrote:I checked out flashearth to see if their imagery showed the stone yard development in Kalamazoo (it doesn't) and happened to notice something odd - there is a train on the NYC North just north of Patterson. Guessing it is stopped due to the proximity to the grade crossing. It has two units at the south end, and about thirty cars, almost all boxcars with six center beams at the end...clearly not local traffic for the north side of Kalamazoo. Has anyone seen or heard of them stashing a train up there? Perhaps its the turn from Grand Rapids and they didn't have room in Botsford. The yard only has four empty tracks in the imagery...if a few of those were out of service I could see them needing to put the train somewhere else to make room for the NS job from Battle Creek or a turn arriving from Elkhart. Or maybe its the south local and they backed it up there to allow a turn from Elkhart to clear BO before going south.

https://zoom.earth/#42.304667,-85.575849,17z,sat

Train from Otsego maybe? Boxcars would be something they would have. Looking at the yard, I don't see a lot of room to put anything else in the yard.
At first I thought it was 303, but then I realized they would be on the GR&I. I think either they're pulling them out of storage, or putting them in. If you follow the tracks north you will find a plethora of cars. Either manufacturing in Parchment has made a stunning come back, or they're using the line for storage. I suspect the latter is more likely than the former.
Trails to Rails. Put the track back.

User avatar
MQT1223
O Scale Railfanner
Posts: 4028
Joined: Wed Sep 10, 2014 1:46 pm
Location: Grandville, Michigan
Contact:

Re: GDLK Operations

Unread post by MQT1223 »

Jim_c wrote:
chapmaja wrote:
Ben Higdon wrote:I checked out flashearth to see if their imagery showed the stone yard development in Kalamazoo (it doesn't) and happened to notice something odd - there is a train on the NYC North just north of Patterson. Guessing it is stopped due to the proximity to the grade crossing. It has two units at the south end, and about thirty cars, almost all boxcars with six center beams at the end...clearly not local traffic for the north side of Kalamazoo. Has anyone seen or heard of them stashing a train up there? Perhaps its the turn from Grand Rapids and they didn't have room in Botsford. The yard only has four empty tracks in the imagery...if a few of those were out of service I could see them needing to put the train somewhere else to make room for the NS job from Battle Creek or a turn arriving from Elkhart. Or maybe its the south local and they backed it up there to allow a turn from Elkhart to clear BO before going south.

https://zoom.earth/#42.304667,-85.575849,17z,sat

Train from Otsego maybe? Boxcars would be something they would have. Looking at the yard, I don't see a lot of room to put anything else in the yard.
At first I thought it was 303, but then I realized they would be on the GR&I. I think either they're pulling them out of storage, or putting them in. If you follow the tracks north you will find a plethora of cars. Either manufacturing in Parchment has made a stunning come back, or they're using the line for storage. I suspect the latter is more likely than the former.
The current state of things in the Parchment area is sad. First time I went there I was awestruck by how much of the town was basically dead. I bet it was a hopping place back when the Paper Mills were still up and running.
1223 OUT! President and Founder of the Buck Creek Central, the Rolling River Route! (2012-2017) President and Founder of the Lamberton Valley Railroad, The Tin Plate Road! Proudly railfanning with Asperger's since 1996. :)

GAP
Railroadfan...fan
Posts: 239
Joined: Tue Mar 14, 2006 9:06 pm
Location: Portage MI

Re: GDLK Operations

Unread post by GAP »

Back in the early 1960s I was railfanning downtown Kalamazoo and saw the CK&S switcher job return from Parchment with 42 cars! They called out a second SW-1 to help that much train around the sharp curve. That move meant going from southbound to westbound east of BO tower, then they had to back into Botsford crossing over from the north track to the south track before entering the yard. It used to be a busy place, indeed.

1TrackMind
Railroadfan...fan
Posts: 222
Joined: Thu May 24, 2018 5:47 pm

Re: GDLK Operations

Unread post by 1TrackMind »

Ben Higdon wrote:I checked out flashearth to see if their imagery showed the stone yard development in Kalamazoo (it doesn't) and happened to notice something odd - there is a train on the NYC North just north of Patterson. Guessing it is stopped due to the proximity to the grade crossing. It has two units at the south end, and about thirty cars, almost all boxcars with six center beams at the end...clearly not local traffic for the north side of Kalamazoo. Has anyone seen or heard of them stashing a train up there? Perhaps its the turn from Grand Rapids and they didn't have room in Botsford. The yard only has four empty tracks in the imagery...if a few of those were out of service I could see them needing to put the train somewhere else to make room for the NS job from Battle Creek or a turn arriving from Elkhart. Or maybe its the south local and they backed it up there to allow a turn from Elkhart to clear BO before going south.

https://zoom.earth/#42.304667,-85.575849,17z,sat
Looks like a 501 train staged to go south.

User avatar
justalurker66
Railroadfan...fan
Posts: 1964
Joined: Tue Feb 15, 2011 2:51 am

Re: GDLK Operations

Unread post by justalurker66 »

1TrackMind wrote:Looks like a 501 train staged to go south.
Is that routine?

KC8RBK
Railroadfan...fan
Posts: 6600
Joined: Sat Oct 23, 2010 11:41 pm
Location: Charlotte, Mi
Contact:

Re: GDLK Operations

Unread post by KC8RBK »

David Lang wrote:I concur with NSSD70ACe's observation.

I too have been by there. Tracks in place, but no additional activity that I can tell at this time.

Maybe something will change as we move closer to spring, but if this stone yard was really coming quickly, I would not think winter would be holding it up. Maybe I'm wrong, but we will see.

Gravel trains (trucks) can't run now anyway due to seasonal road weight restrictions correct?

David Lang
Seasonal restrictions aren't on yet that I've seen yet but they probably will be soon. Freight can still move during frost laws but the axle weights are lowered (making it unprofitable most often) and can't drive over 35 mph. Of course that only applies to restricted routes, class A roads aren't affected. Where is the stone yard going in at? I'm just getting familiar with the gdlk system.

Jim_c
Railroadfan...fan
Posts: 311
Joined: Sun Apr 09, 2017 6:14 pm

Re: GDLK Operations

Unread post by Jim_c »

1TrackMind wrote:
Looks like a 501 train staged to go south.

You might be right although that seems like a long way to back up a train of that size. I followed the tracks south, and sure enough, there's a train taken apart in Three Rivers with what appears to be a locomotive sticking its nose out of the paper mill. Without a passing track, or better yet, a double track main, 501 would have to wait. Why not wait in the yard, though?
Trails to Rails. Put the track back.

User avatar
justalurker66
Railroadfan...fan
Posts: 1964
Joined: Tue Feb 15, 2011 2:51 am

Re: GDLK Operations

Unread post by justalurker66 »

Arial photos taken miles away are certainly not taken at the same moment and not necessarily taken on the same day.

I could see GDLK pushing a southbound train up north if they needed to clear yard tracks for an inbound train - but otherwise I agree that a southbound would simply leave the yard and keep heading south. (I wonder if using the north tracks would help with the problem of doubling a train on the curve? Such use sounds messy.)

NSSD70ACe
The Conrail Guru
Posts: 1084
Joined: Mon Mar 25, 2013 1:34 pm
Location: Bottom of Lake Mead

Re: GDLK Operations

Unread post by NSSD70ACe »

justalurker66 wrote:Arial photos taken miles away are certainly not taken at the same moment and not necessarily taken on the same day.

I could see GDLK pushing a southbound train up north if they needed to clear yard tracks for an inbound train - but otherwise I agree that a southbound would simply leave the yard and keep heading south. (I wonder if using the north tracks would help with the problem of doubling a train on the curve? Such use sounds messy.)
I’ve never seen or heard of a SB train being pushed up that far. Only thing I can think of is if they either had to clear the yard for an inbound (again, something I’ve never seen or heard about before, but not impossible) or that particular train took a cut of cars up to the plant there before heading south.
:roll:

the contents of the above post are my opinion and mine alone, and do not necessarily reflect the views of my employer.

User avatar
Ben Higdon
Railroadfan...fan
Posts: 843
Joined: Wed Jan 25, 2006 2:02 pm

Re: GDLK Operations

Unread post by Ben Higdon »

Jim_c wrote:
chapmaja wrote:
Ben Higdon wrote:I checked out flashearth to see if their imagery showed the stone yard development in Kalamazoo (it doesn't) and happened to notice something odd - there is a train on the NYC North just north of Patterson. Guessing it is stopped due to the proximity to the grade crossing. It has two units at the south end, and about thirty cars, almost all boxcars with six center beams at the end...clearly not local traffic for the north side of Kalamazoo. Has anyone seen or heard of them stashing a train up there? Perhaps its the turn from Grand Rapids and they didn't have room in Botsford. The yard only has four empty tracks in the imagery...if a few of those were out of service I could see them needing to put the train somewhere else to make room for the NS job from Battle Creek or a turn arriving from Elkhart. Or maybe its the south local and they backed it up there to allow a turn from Elkhart to clear BO before going south.

https://zoom.earth/#42.304667,-85.575849,17z,sat

Train from Otsego maybe? Boxcars would be something they would have. Looking at the yard, I don't see a lot of room to put anything else in the yard.
At first I thought it was 303, but then I realized they would be on the GR&I. I think either they're pulling them out of storage, or putting them in. If you follow the tracks north you will find a plethora of cars. Either manufacturing in Parchment has made a stunning come back, or they're using the line for storage. I suspect the latter is more likely than the former.
Unfortunately the GP Epic plant closed, so now there isn't a single customer left in Parchment. Hopefully someone will move into the old plant and use rail before they remove the NYC north of Mosel.
Looking at the train's makeup, I doubt any of it is storage related.

GAP
Railroadfan...fan
Posts: 239
Joined: Tue Mar 14, 2006 9:06 pm
Location: Portage MI

Re: GDLK Operations

Unread post by GAP »

About 2:20 this afternoon 501 southbound hit a semi-tractor (no trailer) that was coming out of one of the business driveways east of the tracks. Engines 4009 and 2204 were stopped with a very long train. I couldn't count the cars because I was trying to navigate thru all the fire trucks and police cars and opposing traffic. There were flashing lights everywhere but no ambulance so hopefully no one was hurt. The tractor was spun around and facing northwest. I did see one GINX car which is cotton seed for White Pigeon. At the rear there were lots of centerbeams, some with loads that looked different than normal.

GAP
Railroadfan...fan
Posts: 239
Joined: Tue Mar 14, 2006 9:06 pm
Location: Portage MI

Re: GDLK Operations

Unread post by GAP »


User avatar
justalurker66
Railroadfan...fan
Posts: 1964
Joined: Tue Feb 15, 2011 2:51 am

Re: GDLK Operations

Unread post by justalurker66 »

Do trains sound their horns for the private crossings along Shaffer Rd?

1TrackMind
Railroadfan...fan
Posts: 222
Joined: Thu May 24, 2018 5:47 pm

Re: GDLK Operations

Unread post by 1TrackMind »

justalurker66 wrote:Do trains sound their horns for the private crossings along Shaffer Rd?
yes

Jim_c
Railroadfan...fan
Posts: 311
Joined: Sun Apr 09, 2017 6:14 pm

Re: GDLK Operations

Unread post by Jim_c »

GDLK was NB from Plainwell after working Otsego at 7:20 PM. Power was 4225 and 4206 with about 52 cars with many if not most short NS hoppers right behind the power. Couldn't tell for sure if they were covered hoppers. A few tanks, gons, boxes, and standard size CH's made up the rest. Pretty late for the NB run.
Trails to Rails. Put the track back.