C&M Walker Ave Bridge is Coming Down

Unread post by Saturnalia »

https://content.govdelivery.com/bulleti ... OT-21b3a3a

The Walker Ave bridge over the Coopersville & Marne will be demolished and replaced with an at-grade railroad crossing, to eliminate weight restrictions, widen the road, and improve sight distances for drivers. I surmise that it will become the second crossing with active protection on the C&M, joining Fruit Ridge Ave.

This is on the Kent Division, which sees only freight movements, no passenger. The trackage in the area is exempt.
MDOT wrote:November 14, 2018 -- The Michigan Department of Transportation (MDOT) has awarded a $1,770,000 Transportation Economic Development Fund (TEDF) Category A grant to the City of Walker for safety and capacity improvements. The grant will leverage $6,300,000 in private investment, at a private/public ratio of more than 4-to-1.

Michigan-based BISSELL Homecare, Inc. is a global floorcare/homecare business headquartered in Walker. Its headquarters and cleaning solutions facility growth has been hindered by the existing Walker Avenue bridge over the Coopersville and Marne Railway. The structure is currently weight-restricted and in need of repair. Additionally, the proximity of BISSELL's sole access drive to the structure does not allow for adequate site distances for all motorists.

To improve site distances and allow unrestricted access to the BISSELL facility, the City of Walker will remove the structure and replace it with an at-grade railroad crossing. Removal of the structure and construction of the grade crossing will enable the city to widen the roadway to four lanes, allowing for increased accessibility for commercial and employee traffic.

Bridge removal was a significant factor in BISSELL's decision to renovate and repurpose their existing headquarters. While making its decision to upgrade the facility, the company worked closely with the City of Walker on addressing their site concerns. The relationship provided BISSELL the confidence to invest $6,300,000 to renovate the building, resulting in the creation of 99 new jobs.

"BISSELL has been working closely with MDOT and the City of Walker on plans for a grade level railroad crossing on Walker Avenue," said Mark Bissell, BISSELL Homecare, Inc. chairman and chief executive officer. "Our expansion plans continue to focus on our Walker facility, and we see this change as a positive step and an opportunity to create a safe environment for our associates."

The total cost of the project is $2,950,000, including $1,770,000 in TEDF Category A funding and $1,180,000 from the City of Walker.
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DaveO
Read more, think more, post less
Posts: 1453
Joined: Thu Dec 14, 2017 12:57 pm
Location: Between here and there

Re: C&M Walker Ave Bridge is Coming Down

Unread post by DaveO »

This would be the same MDOT that has for years been insisting on communities closing rail crossings to improve safety?

Improving sight distance? That's going to be interesting as basically the track is in a cut and the road takes a level path above. See the Street View https://goo.gl/maps/DM3KeDu7tcA2 . So to get it down to track level is going to require some major cutting. Cuts tend to cause sight line issues, not improve them.

User avatar
Saturnalia
Authority on Cat
Posts: 15385
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: C&M Walker Ave Bridge is Coming Down

Unread post by Saturnalia »

DaveO wrote:This would be the same MDOT that has for years been insisting on communities closing rail crossings to improve safety?

Improving sight distance? That's going to be interesting as basically the track is in a cut and the road takes a level path above. See the Street View https://goo.gl/maps/DM3KeDu7tcA2 . So to get it down to track level is going to require some major cutting. Cuts tend to cause sight line issues, not improve them.
I've driven that road a lot, and while the new alignment will be in a cut, the road will be more or less on a single plane instead of the huge hump it is right now. So yes there is a bit of a trade in sight distance down the track for sight distance along the road. But, with only about 100 trains per year using the railroad, that won't be much of an issue. My hunch is they'll either go with full-service automated warning devices to throw up a stop-and-flag order.

Either way a MUCH better solution to what's there now. There are no sight lines on the road and it leaves BISSEL traffic to "just go for it" when pulling out of their driveway. Not a very safe condition.
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
NS3322
Railroadfan...fan
Posts: 1255
Joined: Sun Nov 08, 2015 12:08 pm
Location: CP-LEVITT

Re: C&M Walker Ave Bridge is Coming Down

Unread post by NS3322 »

Saturnalia wrote:
DaveO wrote:But, with only about 100 trains per year using the railroad, that won't be much of an issue.

They run that many!?

User avatar
J T
Hates Supper
Posts: 11367
Joined: Mon Dec 11, 2006 7:23 pm
Location: Grand Rapids
Contact:

Re: C&M Walker Ave Bridge is Coming Down

Unread post by J T »

DaveO wrote:This would be the same MDOT that has for years been insisting on communities closing rail crossings to improve safety?

Improving sight distance? That's going to be interesting as basically the track is in a cut and the road takes a level path above. See the Street View https://goo.gl/maps/DM3KeDu7tcA2 . So to get it down to track level is going to require some major cutting. Cuts tend to cause sight line issues, not improve them.
On the north side, it appears that they can probably start digging around the line where the newer asphalt is. With the hill that will create, it will likely only affect one business on the west side of the street, which could easily reroute their entrance to be across from Waldorf.
Screen Shot 2018-11-15 at 4.50.00 PM.jpg
https://www.flickr.com/photos/jimthias/
GRHC - you know every night I can imagine he is in front of his computer screen sitting in his underwear swearing profusely and drinking Blatz beer combing the RailRoadFan website for grammatical errors.

Raildudes dad
Roadmaster
Posts: 4753
Joined: Fri Dec 23, 2005 9:12 am
Location: Grand Rapids, MI

Re: C&M Walker Ave Bridge is Coming Down

Unread post by Raildudes dad »

The road was raised in 1961 when the old timber trestle was replaced. I have a copy of those plans. Look at the ground level on the south end of the Walker Tool and Die building. Look at the lawn area at Bissell. You can see the old ground level if you know where to look. The RR has insisted on raising the RR grade at a minimum of 8 feet to ensure good sight distance. RR speed limit is 10 mph. The crossing will be getting signals and gates.
Note: I have read the MDOT Order authorizing the grade crossing :wink:

User avatar
DaveO
Read more, think more, post less
Posts: 1453
Joined: Thu Dec 14, 2017 12:57 pm
Location: Between here and there

Re: C&M Walker Ave Bridge is Coming Down

Unread post by DaveO »

Raildudes dad wrote:The RR has insisted on raising the RR grade at a minimum of 8 feet to ensure good sight distance.
Does that mean the Meijer siding comes out?

Raildudes dad
Roadmaster
Posts: 4753
Joined: Fri Dec 23, 2005 9:12 am
Location: Grand Rapids, MI

Re: C&M Walker Ave Bridge is Coming Down

Unread post by Raildudes dad »

No, not coming out.

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10431
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: C&M Walker Ave Bridge is Coming Down

Unread post by SD80MAC »

NS3322 wrote:
Saturnalia wrote:
DaveO wrote:But, with only about 100 trains per year using the railroad, that won't be much of an issue.

They run that many!?
They've been running freight at least once or twice a week all year. Figure thats "4" trains a week in the sense that the study classifies "trains".
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

User avatar
Schteinkuh
Railcam Terrorizer
Posts: 685
Joined: Sun Oct 16, 2011 4:06 pm
Location: LansingRailFan’s Mom’s House

Re: C&M Walker Ave Bridge is Coming Down

Unread post by Schteinkuh »

NS3322 wrote:
Saturnalia wrote:
DaveO wrote:But, with only about 100 trains per year using the railroad, that won't be much of an issue.

They run that many!?
Not including extra moves, we're well over 100 (east and west) trips on the year so far. Maybe 130-140?
According to all known laws of aviation, there is no way a bee should be able to fly. Its wings are too small to get its fat little body off the ground. The bee, of course, flies anyway because bees don't care what humans think is impossible.

User avatar
NS3322
Railroadfan...fan
Posts: 1255
Joined: Sun Nov 08, 2015 12:08 pm
Location: CP-LEVITT

Re: C&M Walker Ave Bridge is Coming Down

Unread post by NS3322 »

Schteinkuh wrote:Not including extra moves, we're well over 100 (east and west) trips on the year so far. Maybe 130-140?
Wow, that is awesome to hear! That much lumber is being shipped out? Or is there a new customer I am unaware of?

User avatar
MQT1223
O Scale Railfanner
Posts: 4028
Joined: Wed Sep 10, 2014 1:46 pm
Location: Grandville, Michigan
Contact:

Re: C&M Walker Ave Bridge is Coming Down

Unread post by MQT1223 »

NS3322 wrote:
Schteinkuh wrote:Not including extra moves, we're well over 100 (east and west) trips on the year so far. Maybe 130-140?
Wow, that is awesome to hear! That much lumber is being shipped out? Or is there a new customer I am unaware of?
Still just the lumber customer, but instead of just one or two centerbeams they get two per run multiple times a week. Not sure if the lumber customer can handle more then 2.
1223 OUT! President and Founder of the Buck Creek Central, the Rolling River Route! (2012-2017) President and Founder of the Lamberton Valley Railroad, The Tin Plate Road! Proudly railfanning with Asperger's since 1996. :)

Raildudes dad
Roadmaster
Posts: 4753
Joined: Fri Dec 23, 2005 9:12 am
Location: Grand Rapids, MI

Re: C&M Walker Ave Bridge is Coming Down

Unread post by Raildudes dad »

The average is about 1.5 per week. Standard can unload 2 at a time. It is rare to have 3 or 4 at a time but it has happened.

User avatar
~Z~
Sofa King Admin
Posts: 12908
Joined: Tue Oct 12, 2004 2:14 pm
Location: Grand Rapids, MI
Contact:

Re: C&M Walker Ave Bridge is Coming Down

Unread post by ~Z~ »

Target date to start the removal of the bridge is April 27, 2020: https://www.fox17online.com/news/local- ... PuMC3VBDkg