I really can't see them ripping it out, but they have been talking about replacing it for a while now, sounds like they're finally getting to it.CSX_CO wrote:I think it means they are going to rip the diamond out. Those short sections of rails will be for where the diamond used to be.
Practice Safe CSX

CSX_CO wrote:I think it means they are going to rip the diamond out. Those short sections of rails will be for where the diamond used to be.
Practice Safe CSX
SEVERAL YRS. AGO THEY REMOVED THE DIAMOND [ANYONE REMEMBER THE YR.?] AND THE STATE OF MI. FORCED THEM TO REPLACE IT..
PAT.C wrote: SEVERAL YRS. AGO THEY REMOVED THE DIAMOND [ANYONE REMEMBER THE YR.?]
Late December: GTW removes the diamonds at Durand following a collision between a light road engine and it's own train. TSBY must now wye its way thru Durand on the GTW main line. TSBY and the city are considering legal action to have the diamonds reinstalled. [MRC-4/1988]
November 14: After being torn out for about two years, the crossing diamonds for the GTW and the TSBY at Durand are back in place. [AATHA-W/1990]