Tunnel Troubles.
- M.D.Bentley
- Railroadfan...fan
- Posts: 2473
- Joined: Sat May 07, 2005 4:41 pm
- Location: Downriver
Tunnel Troubles.
C P Rail reporting a broken rail in the Detroit River Tunnel. Expect delays on both side.
Re: Tunnel Troubles.
The Detroit River Tunnel has two tracks and very little traffic. Why would there be any traffic delays?
Re: Tunnel Troubles.
Only one bore had clearances improved. Five trains or fifty trains, if you get there and M of W is busy changing rail it's a delay.
Re: Tunnel Troubles.
Highly doubtful if M&W is working in tunnel train traffic can be run.