Unread post by ConrailDetr​oit »

Ties has been set out north of Milwaukee Jct on the Holly Sub. Perhaps the jointed rail will be replaced? There is also rail set out on the Shoreline Sub just west of Beaubien.


ImageCN 515 & Tie Train by tcamp7837, on Flickr

ImageCN Tie Train - Holbrook St, Detroit by tcamp7837, on Flickr

ImageCN TIe Train - Sugarhouse Wye by tcamp7837, on Flickr

ImageCN Tie Train - D&M, Detroit by tcamp7837, on Flickr

CN has installed these two red markers at the 5th Street sidewalk crossing in Royal Oak. What do these mean?

ImageIMG_1431 by tcamp7837, on Flickr

JoJames
Railroadfan...fan
Posts: 733
Joined: Sat Oct 09, 2010 10:21 pm
Location: Hamler Ohio

Re: CN Holly Sub Trackwork

Unread post by JoJames »

Bottom photo of red stop boards more than likely means beginning of work limits for M&W.
Always try to put new rail down before the ties. Otherwise your spiking the new ties twice. This causes ties to have a shorter life.

MiddleMI
Railroadfan...fan
Posts: 417
Joined: Thu Jan 16, 2014 2:23 am

Re: CN Holly Sub Trackwork

Unread post by MiddleMI »

And old project map for the West Detroit Connection Track project had a point around the Beaubien Interlocking labeled as "Proposed Siding (Pocket Track)." I don't know what this is, though, or if this is related to that.

GTWChris
Railroadfan...fan
Posts: 2982
Joined: Tue Jul 28, 2009 3:42 pm

Re: CN Holly Sub Trackwork

Unread post by GTWChris »

There's also been a lot of work around the Troy Transit Center. Crew has been working on main 2 welding the rail together through the turn.

Manistique
Railroadfan...fan
Posts: 4251
Joined: Thu Jun 16, 2016 9:33 pm
Contact:

Re: CN Holly Sub Trackwork

Unread post by Manistique »

As to the hope that the Holly Sub gets welded rail on the Holly through Detroit, my guess is that it won't any time soon. The reason I give is that from 8 Mile Road down through the city there is a City of Detroit speed restriction of something line 30 mph (maybe only on sections where there are road crossings) and why incur the cost to have welded rail when the speed is so slow? Take Amtrak through here and see how rough a ride it is even at 30 mph on the jointed rail. North of 8 Mile is another story where Main 1 is welded all the way (I think) to Pontiac but Main 2 remains largely jointed as it serves largely as a long siding now with traffic on the Holly at historically low levels with little chance of increasing with the de-industrialization of Pontiac and Detroit. Main 2 would make a good commuter train line here: Many of the old SEMTA commuter train station sites still exist in the weeds.

wagnew0923
Railroadfan...fan
Posts: 416
Joined: Sun Jun 10, 2012 10:37 am

Re: CN Holly Sub Trackwork

Unread post by wagnew0923 »

Where are those old stations at?

ConrailDetr​oit
Railroadfan...fan
Posts: 5923
Joined: Sun Apr 29, 2007 10:04 pm
Location: Detroit

Re: CN Holly Sub Trackwork

Unread post by ConrailDetr​oit »

In Ferndale, just north of 9 Mile on the west side of the tracks the stairs to the platform still exist.

The station at Northwood Blvd in Royal Oak may still exist as a platform. Same for Charing Cross in Bloomfield Hills.

Manistique
Railroadfan...fan
Posts: 4251
Joined: Thu Jun 16, 2016 9:33 pm
Contact:

Re: CN Holly Sub Trackwork

Unread post by Manistique »

The property for the commuter train parking lot at Charing Cross station was just sold this year or last for private development but it is still empty.

The platforms for the Bloomfield Hills Station at Long Lake Road (18 Mile Road) station are still there though the parking lot was bought by the City of Bloomfield Hills years ago and a storage/maintenance facility and building are there now.

wagnew0923
Railroadfan...fan
Posts: 416
Joined: Sun Jun 10, 2012 10:37 am

Re: CN Holly Sub Trackwork

Unread post by wagnew0923 »

Where is Charring Cross at?

Manistique
Railroadfan...fan
Posts: 4251
Joined: Thu Jun 16, 2016 9:33 pm
Contact:

Re: CN Holly Sub Trackwork

Unread post by Manistique »

In a neighborhood in Bloomfield Hills. Charing Cross is a road off of Woodward between 16 Mile (Big Beaver) and Lone Pine (roughly 17 Mile, Wattles further east). The station was on the west side of the tracks on the south side of Charing Cross. The big fenced in lot there was the parking lot with a small shelter at track level (gone now).

If you are interested in SEMTA commuter train stuff, see my book Chronicles of a Detroit Railfan Vol 8, SEMTA. available from my website (ByronBabbish.com) or Amazon.

Stinger4me
Railroadfan...fan
Posts: 89
Joined: Thu Nov 26, 2009 10:37 am
Location: In Michigan

Re: CN Holly Sub Trackwork

Unread post by Stinger4me »

As I looked at the first image along the drivers side of the tractor trailer it apppears there is a bridge over the tracks, what is it? Thanks for the help. Is the background north of the truck?

blueheron13
Railroadfan...fan
Posts: 531
Joined: Wed Jun 07, 2017 4:01 pm
Location: All over Southeast Michigan

Re: CN Holly Sub Trackwork

Unread post by blueheron13 »

Stinger4me wrote:As I looked at the first image along the drivers side of the tractor trailer it apppears there is a bridge over the tracks, what is it? Thanks for the help. Is the background north of the truck?
I'm guessing the photo is looking north from the Holbrook crossing. The big billboards look like those near where the Holly Sub crosses over I-75. If so, the bridge that can be seen over the tracks, though distant, would be the ramps from the eastbound Davison Freeway (M-8) to NB and SB I-75 at the I-75/M-8 interchange. The signal on the right-hand side of the picture might be the one at Caniff.
Amateur railfan trying to become a real railfan since 2017.

Post Reply