Shoud'a posted this yesterday.
- M.D.Bentley
- Railroadfan...fan
- Posts: 2473
- Joined: Sat May 07, 2005 4:41 pm
- Location: Downriver
Shoud'a posted this yesterday.
The NS is replacing the bridge over the Raisin River in Monroe on the #2 main. Back ups and bottle necks as expected. This is the 2nd day of the 48 hour outage. Sorry about the timing.