Brighton Park IL Blades coming down soon!

Anything pertaining to railfanning in Illinois.
GP30M4216
Saver of all History
Posts: 4886
Joined: Wed Oct 27, 2004 10:35 pm
Location: Feel the Zeel, MI
Contact:

Brighton Park IL Blades coming down soon!

Unread post by GP30M4216 »

Image

According to the caption from this super cool photo at Railpictures.net,

"Remarks: The operator at Brighton Park has a southbound lined up on the CSX tracks. Although lined up all trains that operate thru this Jct. still have to stop and proceed for the diamond. That will be soon changing when around July 4th this tower will be closed."

For anyone not familiar with this junction - it is a not interlocked crossing between a number of important rail lines on Chicago's west side. All trains must stop at the tower and the operator will line trains up with the classic semaphores. Here are a couple other photos to illustrate what the track layout and blades look like. Get your photos soon!!!

Image
Remarks: A UP manifest heads south on the B&OCT through Brighton Park to deliver the consist to CSX at Barr Yard.

Image
Remarks: UP 3043 still in its CNW paint, passes the semaphore at Brighton Park.

Image
Remarks: These are the last operating and manned semaphores in Chicago land. This Jct. is owned by CSXT and manned by NS.

Image
And, a classic view from 1978!

sd70accsxt700
Sofa King follower
Posts: 6159
Joined: Sat Apr 23, 2005 1:59 pm
Location: Toledo, OH.

Unread post by sd70accsxt700 »

So what are they doing, remoting it. Who will control it.
https://flic.kr/ps/jSuAb My Flickr photos!

GTW 4914
Railroadfan...fan
Posts: 66
Joined: Sun Mar 11, 2007 7:51 pm
Location: saginaw mich

Unread post by GTW 4914 »

I am familier with that interlocking it is a real neat place to watch trains always something coming and all trains have to stop even AMTRAK and METRA that settles it dolton will have to wait till november il be going to brighton park memorial weekend. before they automate that interlocking.

GP30M4216
Saver of all History
Posts: 4886
Joined: Wed Oct 27, 2004 10:35 pm
Location: Feel the Zeel, MI
Contact:

Unread post by GP30M4216 »

Couple more recent photos. When they automate it, I don't know who will get control. (see below)

Image
Remarks: A BNSF stack train heads west through the semophores at Brighton Park. Work is being done to automatic this manual junction with a rumored cutover of July 4, 2007.

Image
Remarks: A lone pony leads doublestacks west through the semophores at Brighton Park. Work is being done to automatic this manual junction with a rumored cutover of July 4, 2007.

According to the page about Brighton Park on the exellent website Chicago Rail Junctions, "Going to Brighton is like going back to the 1940's--one of the few places where semaphores actuated by rods can still be found. However, Norfolk Southern has begun construction of a remote interlocking that will replace this antiquated plant. The cabin and semaphores will probably be gone by summer or fall of 2007. Better hurry if you want to see this relic from the past."

Check this link if you are unfamiliar with this junction! it's GREAT! http://www.dhke.com/CRJ/brighton.html

User avatar
EJ&ESDM809
Railroadfan...fan
Posts: 388
Joined: Sun Jul 15, 2007 2:07 am
Location: Joliet, IL
Contact:

Unread post by EJ&ESDM809 »

The semaphores came down on the evening of July 6th around 8:30PM I would've went to see them on the 6th but I was at Steamtown for RailCamp.
Robby Gragg - Proud fan of the EJ&E Railway

User avatar
Scooterb
Sofa King Grumpy
Posts: 4591
Joined: Tue Oct 12, 2004 9:26 pm
Location: Jackson

Unread post by Scooterb »

You must have been at camp with Gregg?

Nice selection of pics on the "big site"

Welcome aboard.

RailCanon
BANHAMMERED
Posts: 2327
Joined: Sat Oct 23, 2004 11:26 am
Location: East Lansing, MI
Contact:

Unread post by RailCanon »

Scooterb wrote:You must have been at camp with Gregg?
Yep!
Welcome to Railroadfan, Robby!

User avatar
EJ&ESDM809
Railroadfan...fan
Posts: 388
Joined: Sun Jul 15, 2007 2:07 am
Location: Joliet, IL
Contact:

Unread post by EJ&ESDM809 »

Yes I was at RailCamp with Gregg. I'm glad to be here! I actually went to Brighton Park a little while ago. I didn't see any trains, but I did get a photo of the semaphores.
Last edited by EJ&ESDM809 on Tue Jul 17, 2007 3:06 pm, edited 1 time in total.
Robby Gragg - Proud fan of the EJ&E Railway

GP30M4216
Saver of all History
Posts: 4886
Joined: Wed Oct 27, 2004 10:35 pm
Location: Feel the Zeel, MI
Contact:

Unread post by GP30M4216 »

I have always been impressed with articles written in the Chicago Tribune about railroading. This is an excellent article about the closing of the manual junction at Brighton Park:

Upgrade program running on rails
Shanty's closing is part of track updates


Published July 16, 2007


Railroad workers are pretty darn tough people, but Leslie Moore Jr. says he got a little choked up when the door was padlocked this month on the ramshackle shanty at the Chicago rail junction known as Brighton Park.

It's there, on the Southwest Side at the gateway to sprawling rail yards in the nation's busiest railroad hub, that for decades switch-tenders like Moore manually operated semaphore towers to signal approaching trains to stop, then to proceed through the busy crossing of intersecting tracks.

The semaphores, a visual signaling apparatus with colored lights, were installed in 1944, replacing an even lower-tech communications system -- yellow lanterns that switch-tenders waved at train engineers.

"I liked the solitude of the shanty and being depended on by so many people to keep the trains moving," said Moore, 35, a veteran Norfolk Southern Railro ad conductor, engineer, switch-tender and now dispatcher, reflecting on the ending of an era.

More than 70 trains a day inched up to Brighton Park at "walking speed," then stopped, sometimes waiting 10 or 15 minutes for track clearance, and started up again on the congested tracks. It's no wonder it often takes a freight train almost as long to travel through Chicago as it does for the same train to come all the way from the West Coast to reach the outer boundary of the city.

The delays routinely hit passenger trains too. Ten Amtrak trains serving the Chicago-to-St. Louis corridor and six Metra Heritage Corridor Line trains pass through Brighton Park daily.

All that wasted time and lost commerce began to dissipate over the weekend following the 4th of July holiday, when the control shanty was closed and a modern remotely controlled signal system, new crossing diamonds and other improvements were put in at Brighton Park.

Automation of the crossing, a $9.5 million investment, allows trains to pass through the junction at up to 30 m.p.h. if the intersection is clear of other trains, with higher speeds soon to come for passenger trains. The old rule requiring all trains to stop, even if there is no conflicting traffic, has been eliminated.

"Brighton Park has been the poster child for antiquated rail operations in our area for years," said Chuck Allen, Norfolk Southern's superintendent of the Chicago Transportation Coordination Office, which is working to improve the flow of rail traffic through Chicago. "I know of no other place in the country with this level of traffic that did not have modern systems."

The updated equipment and procedures solve only one of the myriad inefficiencies plaguing the Chicago area's outmoded rail system. But the changes are a start, along with seven other modernization projects planned for this year, and eight more in 2008, that are part of a $1.5 billion multi-year program to revamp the region's rail network, expanding capacity and improving safety.

The program is called CREATE, which stands for the Chicago Region Environmental And Transportation Efficiency program. It is expected to generate more than $3.8 billion in benefits to the Chicago region, according to state and local officials.

"We are starting out with the money that is available to do things like adding tracks, upgrading signal systems and increasing train speeds through connections," said Larry Wilson, CREATE program manager at the Illinois Department of Transportation. "It's a huge network improvement to expedite rail traffic through the Chicago area."

As the program advances, depending on when full funding becomes available, five rail corridors would be overhauled. A series of six rail-to-rail "flyover bridges" would also be built to separate freight trains from passenger trains, effectively easing bottlenecks. In addition, tunnels or bridges will be constructed at 25 key railroad crossings to alleviate conflicts between trains and motorists waiting for trains to pass. The separated grade crossings will improve safety and reduce emissions from idling vehicles, officials said.

Until this month, Brighton Park was the only still-operating manually run rail junction handling major traffic levels left in the U.S. It sparked nostalgia and excitement over the old days among rail buffs and historians, who traveled from all over the world to photograph the trackside shanty and watch the line-up of trains.

But to rail freight shippers and the operators of passenger railroads, Brighton Park symbolized the antiquated rail infrastructure in the Chicago region, a global trade center that is in danger of losing the dominance it has held since the 1850s over transportation in the U.S.

So much is at stake. Chicago is the only U.S. city where all six Class 1 North American railroads converge, and half of all U.S. rail freight passes through Chicago's rail yards. More than 500 freight trains and 37,500 carloads of rail freight depart each day from Chicago, which is the world's largest inter-modal container handler after Hong Kong and Singapore, according to World Business Chicago, a non-profit economic development corporation working to expand Chicago's economy.

Moore and his fellow dispatchers at a nearby rail yard now control the trains at Brighton Park. The shanty is locked up to prevent the theft of the semaphore control levers inside. The Norfolk Southern, which owns and operates the Brighton Park junction, is hoping to donate the shanty to a museum, a spokesman said.

"You can't block progress, but it's a little sad," said Moore, a Brighton Park switch-tender for the last six years who now dispatches trains from Norfolk Southern's Ashland Avenue Yards, at Ashland Avenue near Pershing Road. "I almost shed a tear."

Working in front of a computer screen, Moore still functions as a traffic cop, lining up trains and pushing them along. But instead of sitting in the shanty waiting for phone calls from different railroads about approaching trains and having to memorize track-switching alignments, Moore can see all trains coming and going from the computer on his desktop. He clicks the computer mouse to set the signals.

"We can line up the trains much better, eliminating a lot of stops and starts and lowering the costs associated with constantly braking and accelerating," said Moore, a Matteson resident who said his love of the railroads started during childhood when he received train sets every Christmas.

Various levels of government and the railroad industry are four years into the ambitious CREATE venture to expand rail capacity in northeast Illinois, a project of national interest no less important than Chicago's efforts to modernize O'Hare International Airport.

But CREATE's $1.5 billion price tag (in 2003 dollars) is only partially funded. Some $330 million has been pledged for work needed over the next three years.

Congress has authorized $100 million; another $100 million is being contributed from the major railroads; and Chicago is providing $30 million. The state of Illinois has also committed to giving $100 million, but the money is being withheld until the governor and the legislature agree on a new state capital-improvement funding program.

U.S. Rep. Daniel Lipinski (D-Ill.) warned that if a state match is not forthcoming soon -- not only for CREATE but also for many other transportation initiatives needing federal support -- federal money already promised could be in jeopardy and the Illinois congressional delegation would face a more difficult task in winning new grants and funding earmarks.

"The biggest problem I see is that when we start to talk next spring about setting new funding priorities, it will be much harder for the delegation to make the case Illinois should receive more money if we've left federal money on the table," Lipinski said.

-Jon Hilkevitch
http://www.chicagotribune.com/news/loca ... alwest-hed

If you click the link, there is also a link to a unique interview about this CREATE project and Brighton Park.

User avatar
EJ&ESDM809
Railroadfan...fan
Posts: 388
Joined: Sun Jul 15, 2007 2:07 am
Location: Joliet, IL
Contact:

Unread post by EJ&ESDM809 »

That is a very interesting article. It is interesting because of the fact it is told from the switchtender's point of view. I'm glad that NS put them in different jobs instead of just laying them off. I am hoping that IRM gets the shanty. NS is already planning on donating all of the semaphores themselves to museums.
Robby Gragg - Proud fan of the EJ&E Railway

User avatar
NicTrain35
Railroadfan...fan
Posts: 7
Joined: Tue Jul 17, 2007 3:44 pm
Location: Joliet, IL
Contact:

Unread post by NicTrain35 »

Lets hope that IRM gets some of the semaphores! If they get the shanty, that'd be nice too.

I didn't get a chance to see the semaphores in person, but seeing pictures was just as good.
Nick Hart

Joliet, IL

CUBS: 48-43

User avatar
EJ&ESDM809
Railroadfan...fan
Posts: 388
Joined: Sun Jul 15, 2007 2:07 am
Location: Joliet, IL
Contact:

Unread post by EJ&ESDM809 »

They were breaking ground for something at IRM by the big row of signals. Wonder if they are putting more signals in the row, such as some Brighton Park semaphores
Robby Gragg - Proud fan of the EJ&E Railway

User avatar
NicTrain35
Railroadfan...fan
Posts: 7
Joined: Tue Jul 17, 2007 3:44 pm
Location: Joliet, IL
Contact:

Unread post by NicTrain35 »

That's great news! Lets hope that it's for the semaphores from Brighton Park.
Nick Hart

Joliet, IL

CUBS: 48-43

User avatar
cnw8835
Grain Train Fetish LOLZ
Posts: 4735
Joined: Sun Oct 29, 2006 6:19 pm
Location: Grand Rapids, MI
Contact:

Unread post by cnw8835 »

It is reporting that earlier this evening, the old Brighton Park operators shanty was burned down, probably arson. Report indicates that the lever setup survived.

Post Reply