by LakeATCS » Sun Sep 24, 2017 11:06 am
Effective 9/25/2017, at 9:00 a.m.
A New Control Point CP St. John at MP LK 14.60 will be placed in service.
This will be controlled signals on Norfolk Southern and an Automatic diamond on CSX.
NS Westward Home signal 2WA is adjacent to the right of Main Track at MP LK 14.60
NS Eastward Home signal 2EA is adjacent to the right of Main Track at MP LK 14.60
Effective 9/25/2017 at 9:00 AM,
A New Control Point CP Highland at MP LK 7.20 will be placed in service.
NS Westward Home signal 2WA is adjacent to the left of Main Track at MP LK 7.20
NS Westward Home signal 2WD is adjacent to the right of Siding Track at MP LK 7.20
NS Eastward Home signal 2EA is adjacent to the right of Main Track at MP LK 7.20
Effective Wednesday, September 27, 2017 at 9:00 AM,
MP LK 10.30 – Hartsdale Connection
The hand throw switch located at the Hartsdale Connection MP LK 10.30 will have the Electric Lock removed from serviced and retired. Trains and engines must not clear in this switch.