by LakeATCS » Wed Sep 20, 2017 5:49 pm
Already happened, but I will go ahead and post it anyway,
Effective 12:01 PM, Monday, 09-11-17,
#1 power crossover has been installed at MP CD 435.4, for Eastward movements from the Main 1Track to the Main 2 Track
#3 power switch has been installed at MP CD 435.3, for Westward movements from the Main 2 Track to the Signaled Siding Track
#5 power crossover has been installed at MP CD 435.3, for Eastward movements from the Main 2 Track to the Main 1 Track
2E located over and to the right of the Main 1 Track on a cantilever mast at MP CD 435.4
4EA located over and to the right of the Main 2 Track on a cantilever mast at MP CD 435.4.
4ED located to the right of the Controlled Siding Track on a high signal mast at MP CD 435.4.
2W located to the right of the Main 1 Track on a high signal mast at MP CD 435.2
4W located to the left of the Main 2 Track on a high signal mast at MP CD 435.4.
New Automatic Signals 4332E, 4332W, 4331E, 4331W at MP CD 433.4