CP 421 Upgrade

Anything pertaining to railfanning in Indiana.
User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

Equipment remains on Track 2 west of CP 421. The foreman has track authority on 2 until 11:59pm. Track 2 left lined for the real North Freight.

Everyone went home.

The Track 3 to North Freight crossover west of Oakland is being used to go from 3 at CP 423 to 2 east of CP 421.
Last edited by justalurker66 on Sat Oct 14, 2017 1:05 am, edited 2 times in total.

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: CP 421 Upgrade

Unread post by LakeATCS »

justalurker66 wrote:Equipment remains on Track 2 west of CP 421. The foreman has track authority on 2 until 11:59pm. Track 2 left lined for the real North Freight.

Everyone went home.
Hmm that is going to be a mess for the dispatcher.

The early bird to the Coach track is lined eastward at 423. They wouldn't have rigged something up where 423 coach track leads to the new 3/old coach track would they.

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

See edit above (Track 3 crosses to North Freight at the east end of the yard west of Oakland Ave -- so a train could go from eastbound 3 at CP 423 to eastbound 2 at CP 421).

10 MPH restriction on Track 2.

When the foreman gave up his track and time (for everything except Track 2 between CP 423 and CP 421 and separately for the Kalamazoo Branch) it was made clear on the radio that the yard could use South Freight (lined to 3 east of CP 421) and North Freight (lined to 2 east of CP 421).

The final testing that you saw was under local control making sure that the North Freight to Track 2 route could be cleared in either direction. And then the crew went "home".

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

One more view from Friday afternoon. Close clearance!
cp421-171013e.jpg

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

Running 2 hours, 13 minutes late ... Amtrak 49/449 at Elkhart<br />(was 1 hour, 15 minutes late at Waterloo)
Running 2 hours, 13 minutes late ... Amtrak 49/449 at Elkhart
(was 1 hour, 15 minutes late at Waterloo)
CP1 Kalamazoo Branch/Grand Elk<br />Note the small ATCS antenna (no PTC tower at this site)
CP1 Kalamazoo Branch/Grand Elk
Note the small ATCS antenna (no PTC tower at this site)
CP1 Kalamazoo Branch/Grand Elk
CP1 Kalamazoo Branch/Grand Elk
CP 1
Eastbound to Three Rivers - Clear, Approach, Restricting, Stop (bottom head needed for restricting)
Westbound to Elkhart - Approach Medium, Approach, Restricting, Stop (no "Clear" aspect)

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

Not as remarkable as yesterday so far ... a little dreary, raining, lightning ... but NS is getting work done.
The end of old Track 2
The end of old Track 2
Work on the new North Freight (the signal is in the way, but there is an alternate route).
Work on the new North Freight (the signal is in the way, but there is an alternate route).
Welding and grinding on Track 3 (old Coach Track)<br />(WB Signal for Track 2 remains lit from yesterday.)
Welding and grinding on Track 3 (old Coach Track)
(WB Signal for Track 2 remains lit from yesterday.)

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

North Freight to Track 2 has reopened.

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

All quiet. The new Kalamazoo connection is now in two pieces ... one snaked between the old cabinets south of Track 1, the other segment is on top of the branch track ready to be pulled west. The old rail ties and ballast has been removed from the crossing.

The new signal on Track 2 is confusing a train on North Freight. The dispatcher is checking into it.
The dispatcher is talking the train past the bagged signal.

Earlier today a train was warned not to go too slow through the curve due to the superelevation. "That will be 30 tomorrow." Slow trains look like they are leaning.

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

Last Train --- CP stopped transmitting at 8:03am just before 49 rolled through. (There was also a train on 3 to South Freight.)
cp421-171015a.jpg
cp421-171015b.jpg
cp421-171015c.jpg

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

Old signals lit ... not transmitting ATCS. I have heard trains call CP 421 long after Amtrak.

Nasty rain.

Edit: As of 9:50am Track 1 cut no more trains. Signal boxes pulled at CP 421. New signals lit WB. All old dark.

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

75501590010202 --- CP 1?

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

Removing old cabinet by bridge (in the way of new Kalamazoo Branch)
Removing old cabinet by bridge (in the way of new Kalamazoo Branch)
Lifting the diamond
Lifting the diamond
Taking away the diamond
Taking away the diamond

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

Connecting the Kalamazoo Branch
Connecting the Kalamazoo Branch
The new westbound signal bridge all lit up
The new westbound signal bridge all lit up
Removing the crossover between Track 3 (old Coach Track) and North Freight?
Removing the crossover between Track 3 (old Coach Track) and North Freight?

Dajudge
Railroadfan...fan
Posts: 74
Joined: Sat Sep 06, 2014 8:01 pm

Re: CP 421 Upgrade

Unread post by Dajudge »

Not sure about the rest of you and I know things change but this is a sad event. Been watching activity on these tracks for over 40 years, once the bridge is gone, its over. Such is the nature of progress. Onward and upward.

At noon today the boss's had a nice lunch spread set up for all the guys at the west of the station platform. A gazillion sub sandwiches and drink. Nice gesture, specially since they've worked long hours and now in the driving rain and wind. As noon approached in came the ubiquitous white trucks.....

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »


LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: CP 421 Upgrade

Unread post by LakeATCS »

It looks like they are testing everything on 2 main southward to get it open. While 1 main is moved.

User avatar
justalurker66
Railroadfan...fan
Posts: 1968
Joined: Tue Feb 15, 2011 2:51 am

Re: CP 421 Upgrade

Unread post by justalurker66 »

Everything is connected. Testing signals. First train 6:30?

Dajudge
Railroadfan...fan
Posts: 74
Joined: Sat Sep 06, 2014 8:01 pm

Re: CP 421 Upgrade

Unread post by Dajudge »

Some changes made today.
Attachments
DSC_0153.JPG
Old track 1 open
Old track 1 open
New meet old
New meet old

Dajudge
Railroadfan...fan
Posts: 74
Joined: Sat Sep 06, 2014 8:01 pm

Re: CP 421 Upgrade

Unread post by Dajudge »

A few more from today, (cold wet today) .....
Attachments
New WB replacement
New WB replacement
Death to old WB bridge behind Church
Death to old WB bridge behind Church
Old 1 and 2 open on both ends
Old 1 and 2 open on both ends

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: CP 421 Upgrade

Unread post by LakeATCS »

I think there is a pretty epic parking lot from 410 eastward. Seen a lot of westward moves at Kendalville.

At least 3 eastbound thru trains parked from 453 in to 435 out of the way for things that can use the yard.

Post Reply