Signal Replacement/PTC Project Peru to Blakesley WABASH
Posted: Sat Mar 19, 2016 10:17 pm
Well as if the signal projects on the Marion District and the Chicago Line are not enough, here is another one.
The entire section from PERU IN to BLAKESLEY OH is getting a PTC signal upgrade.
Every MCP outside of Fort Wayne is getting redone from scratch. That means all the remaining Wabash search lights will be going bye bye. (one exception so far)
All the intermediates, and the existing MCPs in Fort Wayne are getting PTC antennas. The MCPs of course are getting the higher dual antenna sticks.
Also I saw a higher dual stick antenna at Junction. But that one is on the ex PRR line in Fort Wayne.
Those annoying unbonded sidings on the Wabash north of Fort Wayne are finally getting track circuits.
ST Joe may keep it's searchlights for the Northbound NS. I saw no evidence of work there. (mind you who would know with all the stuff there CSX left after the BIG derailment there)
The entire section from PERU IN to BLAKESLEY OH is getting a PTC signal upgrade.
Every MCP outside of Fort Wayne is getting redone from scratch. That means all the remaining Wabash search lights will be going bye bye. (one exception so far)
All the intermediates, and the existing MCPs in Fort Wayne are getting PTC antennas. The MCPs of course are getting the higher dual antenna sticks.
Also I saw a higher dual stick antenna at Junction. But that one is on the ex PRR line in Fort Wayne.
Those annoying unbonded sidings on the Wabash north of Fort Wayne are finally getting track circuits.
ST Joe may keep it's searchlights for the Northbound NS. I saw no evidence of work there. (mind you who would know with all the stuff there CSX left after the BIG derailment there)