NW Indiana PTC project.

Anything pertaining to railfanning in Indiana.

Re: NW Indiana PTC project.

Unread postby justalurker66 » Sun Jun 18, 2017 5:07 am

The 5000ft view of CP 453 with crossovers ---
cp453-jun17th.jpg

I wish the "before" picture was better. I did not expect the "after" picture to be as good as it turned out. A comparison is below. The after picture is in better focus (I can read the mile marker) and the switch heaters are visible with the white tubes feeding the heat down to the switches.
cp453-compare.jpg
User avatar
justalurker66
Railroadfan...fan
 
Posts: 982
Joined: Tue Feb 15, 2011 3:51 am

Re: NW Indiana PTC project.

Unread postby justalurker66 » Sat Jun 24, 2017 10:32 pm

Don't take the scenic route ---
cp501-June24-2100.png

Captured at the top of the hour - a route from track 1 east of CP 501 was cleared to track 1 west of CP 501 passing through a diverging route. As the train approached the route was taken down (at 10 past the hour). Then after five minutes the switches changed and a more direct route was cleared. The train passed through without diverging.

So, how bad would it have been if the train would have taken the diverging route? Too much risk of stringlining and a derailment? I am surprised that the switch cleared a 1-1 path that wasn't direct, but it would have worked on paper.
User avatar
justalurker66
Railroadfan...fan
 
Posts: 982
Joined: Tue Feb 15, 2011 3:51 am

Re: NW Indiana PTC project.

Unread postby justalurker66 » Fri Jul 14, 2017 10:04 pm

Still getting ready ...
cp435-July8th17.jpg
CP 435 Eastbound in South Bend
User avatar
justalurker66
Railroadfan...fan
 
Posts: 982
Joined: Tue Feb 15, 2011 3:51 am

Re: NW Indiana PTC project.

Unread postby SD80MAC » Sat Jul 15, 2017 3:44 pm

justalurker66 wrote:Don't take the scenic route ---
cp501-June24-2100.png

Captured at the top of the hour - a route from track 1 east of CP 501 was cleared to track 1 west of CP 501 passing through a diverging route. As the train approached the route was taken down (at 10 past the hour). Then after five minutes the switches changed and a more direct route was cleared. The train passed through without diverging.

So, how bad would it have been if the train would have taken the diverging route? Too much risk of stringlining and a derailment? I am surprised that the switch cleared a 1-1 path that wasn't direct, but it would have worked on paper.

Maybe Chicago West anticipated something coming out the yard at Pine and that didn't end up happening.
"Remember, 4 mph is a couple, 5's a collision!"
User avatar
SD80MAC
Ingersoll's Mr. Michigan
 
Posts: 7049
Joined: Thu Mar 10, 2005 5:59 pm
Location: Grand Rapids

Re: NW Indiana PTC project.

Unread postby justalurker66 » Sun Jul 16, 2017 11:46 am

SD80MAC wrote:Maybe Chicago West anticipated something coming out the yard at Pine and that didn't end up happening.

A train out of Pine would not have made it out of the interlocking with the west crossover reversed.
User avatar
justalurker66
Railroadfan...fan
 
Posts: 982
Joined: Tue Feb 15, 2011 3:51 am

Re: NW Indiana PTC project.

Unread postby justalurker66 » Sun Jul 16, 2017 11:37 pm

BTW: The cantilever at CP 435 EB is now in place (behind the current signal).
User avatar
justalurker66
Railroadfan...fan
 
Posts: 982
Joined: Tue Feb 15, 2011 3:51 am

Re: NW Indiana PTC project.

Unread postby tttodisp » Mon Jul 17, 2017 7:43 pm

Any evidence of work at CP 437 yet?
tttodisp
Railroadfan...fan
 
Posts: 78
Joined: Sun Nov 30, 2014 9:13 pm

Re: NW Indiana PTC project.

Unread postby justalurker66 » Mon Jul 17, 2017 8:17 pm

tttodisp wrote:Any evidence of work at CP 437 yet?

All of the new signals at CP 437 have been up since 2015. I have pictures from August 2015 and Google Earth aerials from September 21, 2015, show the new CP 437 signals and heaters. The new signals at CP 437 are nearly exact replacements for the old ... with some variation for the number of heads.

West of CP 437 there are new intermediates (not yet active) all the way to CP 448.

(CP 423 has the new WB up and bagged ... the new EB is sitting on the ground ready to be raised. Google Earth has aerials from April 2017 ... before the cantilevers were added but showing the towers in place.)
User avatar
justalurker66
Railroadfan...fan
 
Posts: 982
Joined: Tue Feb 15, 2011 3:51 am

Re: NW Indiana PTC project.

Unread postby LakeATCS » Wed Jul 19, 2017 8:48 pm

Test addresses seen today for what could be 462 and 463
LakeATCS
Railroadfan...fan
 
Posts: 377
Joined: Sat Feb 28, 2015 6:37 am

Re: NW Indiana PTC project.

Unread postby justalurker66 » Thu Jul 20, 2017 12:56 pm

LakeATCS wrote:Test addresses seen today for what could be 462 and 463

Happy happy happy.

75508800130202 40 bits
75508800140202 48 bits
75508800150202 40 bits

Looks like CP 466 is also seeing some love.

Would that leave CP 482 as the last CP that has not been updated between CP 515 (Englewood) and CP 453 (Rolling Prairie)?
User avatar
justalurker66
Railroadfan...fan
 
Posts: 982
Joined: Tue Feb 15, 2011 3:51 am

Re: NW Indiana PTC project.

Unread postby tttodisp » Thu Jul 20, 2017 1:03 pm

CP 482 (and CP 483) are probably considered "current", at least from a mnemonics standpoint, so I would not expect any changes there.
tttodisp
Railroadfan...fan
 
Posts: 78
Joined: Sun Nov 30, 2014 9:13 pm

Re: NW Indiana PTC project.

Unread postby tttodisp » Fri Jul 21, 2017 6:56 pm

justalurker66 wrote:
LakeATCS wrote:Test addresses seen today for what could be 462 and 463

Happy happy happy.

75508800130202 40 bits
75508800140202 48 bits
75508800150202 40 bits

Looks like CP 466 is also seeing some love.
----------------------

Does anyone recall a pattern of how long after the test addresses appear before the cutovers actually occur?
tttodisp
Railroadfan...fan
 
Posts: 78
Joined: Sun Nov 30, 2014 9:13 pm

Re: NW Indiana PTC project.

Unread postby justalurker66 » Fri Jul 21, 2017 7:36 pm

tttodisp wrote:
justalurker66 wrote:
LakeATCS wrote:Test addresses seen today for what could be 462 and 463

Happy happy happy.

75508800130202 40 bits
75508800140202 48 bits
75508800150202 40 bits

Looks like CP 466 is also seeing some love.


Does anyone recall a pattern of how long after the test addresses appear before the cutovers actually occur?

CP 452 was seen May 25th and went live June 11th (just over two weeks).
User avatar
justalurker66
Railroadfan...fan
 
Posts: 982
Joined: Tue Feb 15, 2011 3:51 am

Re: NW Indiana PTC project.

Unread postby LakeATCS » Wed Jul 26, 2017 6:59 pm

New 462 and 463 go live July 31st

CP 463
#1 power switch has been installed at MP CD 463.8, for Westward movements from the Main 2 Track to the Laporte Siding Track.
#3 power crossover has been installed at MP CD 463.8, for Eastward movements from the Main 2 Track to the Main 1 Track.
#5 power switch has been installed at MP CD 463.7, for Eastward movements from the Main 1 Track to the Laporte Yard Lead Track
#7 power crossover has been installed at MP CD 463.6, for Eastward movements from the Main 1 Track to the Main 2 Track.

2WA located over and to the right of the Main 1 Track on a cantilever mast at MP CD 463.4
2WD Signal located to the right of the Laporte Yard Lead track on a dwarf signal at MP CD 463.7
4W located over and to the right of the Main 2 Track on a cantilever mast at MP CD 463.4
2E located over and to the right of the Main 1 Track on a cantilever mast at MP CD 463.9.
4EA located over and to the right of the Main 2 Track on a cantilever mast at MP CD 463.9.
4ED located over and to the right of the Laporte Siding Track on a cantilever mast at MP CD 463.9.

CP 462
No switches of course

2E located to the left of the Main 1 Track on a high signal mast at MP CD 462.3.
4E located to the right of the Main 2 Track on a high signal mast at MP CD 462.3.
2W located to the right of the Main 1 Track on a high signal mast at MP CD 462.2.
4W located to the left of the Main 2 Track on a high signal mast at MP CD 462.2
6N located to the right of the South Shore Main Track on a high signal mast at MP CD 462.3.
6S located to the right ofthe South Shore Main Track on a high signal mast at MP CD 462.3.
LakeATCS
Railroadfan...fan
 
Posts: 377
Joined: Sat Feb 28, 2015 6:37 am

Re: NW Indiana PTC project.

Unread postby tttodisp » Wed Jul 26, 2017 8:14 pm

Thanks for the details. Hopefully they will do CP 466 the following week.