NS Clevelabnd Drawbridge changes

Anything pertaining to railfanning in Ohio.
LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

NS Clevelabnd Drawbridge changes

Unread post by LakeATCS »

Looks like some big changes at the ex NYC drawbridge down in Cleveland

Controlled Point CP Drawbridge at MP CD 182.5

A new #13 power switch has been installed at
MP CD 181.9, for Eastward movements from the Main 1 Track to
the Main 1 Track.
A new #11 power switch has been installed at MP CD 182.2,
for Eastward movements from the Main 1 Track to the 44
Industrial Track.
A new #9 power crossover has been installed at
MP CD 182.2, for Westward movements from the Main 1 Track to
the Main 2 Track.
A new #7 power switch has been installed at MP CD 182.3,
for Westward movements from the Main 2 Track to the South
Lead Track.
A new #5 power switch has been installed at MP CD 182.3,
for Westward movements from the South Lead Track to the North
Lead Track.
A new #3 power crossover has been installed at MP CD 182.3,
for Westward movements from the Main 2 Track to the Main 1
Track.
A new #1 power crossover has been installed at MP CD 182.6
for Westward movements from the Main 1 Track to the Main 2
Track.

A new Eastward 2E Home Signal located to the left of the
Main 1 Track on a high signal mast at MP CD 182.7.
A new Eastward 4E Home Signal located to the right of the
Main 2 Track on a high signal mast at MP CD 182.7.
A new Eastward 6EA Home Signal located over and to the
right of the South Lead Track on a cantilever mast at
MP CD 182.4.
A new Eastward 6ED Home Signal located over and to the
right of the North Lead Track on a cantilever mast at
MP CD 182.4.
A new Westward 2WA Home Signal located to the left of
the Main 2 Track on a high signal mast at MP CD 181.8.
A new Westward 2WD Home Signal located to the right of
the Main 1 Track on a high signal mast at MP CD 181.8.
A new Westward 2WG Home Signal located to the right of the
44 Industial Track on a high signal mast at MP CD 182.1.
A new Westward 6W Home Signal located to the left of the
Main 1 Track on a high signal mast at MP CD 181.8.

Controlled Point CP 181
A new #1 power switch has been installed at
MP CD 181.2, for Westward movements from the CSX Main
Track to the Main 1 Track.
A new Eastward 2E Home Signal located to the right of
the Main 1 Track on a high signal mast at MP CD 181.2.
A new Westward 2WA Home Signal located to the right of
the CSX Main Track on a high signal mast at MP CD 181.2.
A new Westward 2WD Home Signal located to the left
of the Track 1 on a high signal mast at MP CD 181.2.

bluestreak81
Railroadfan...fan
Posts: 192
Joined: Mon Jan 14, 2013 7:12 pm

Re: NS Clevelabnd Drawbridge changes

Unread post by bluestreak81 »

Does this affect the ex-NKP line at all?

LakeATCS
Railroadfan...fan
Posts: 625
Joined: Sat Feb 28, 2015 5:37 am

Re: NS Clevelabnd Drawbridge changes

Unread post by LakeATCS »

This is the NYC drawbridge and the area around the AMTK station

Post Reply