TO ALL RAILROADS THAT USE THE TBR(TSCR)

Sub forum for Paper Railroads
User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

Well hopefully sometime this winter but with Hurricane Sandy delaying everything we're gonna have to play catch up.
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:Well hopefully sometime this winter but with Hurricane Sandy delaying everything we're gonna have to play catch up.
Our crews are scheduled to wrap up double-tracking work up to St. Joseph by the end of November, likely by Thanksgiving. They're not doing work per se, but are standing by during the cut-in in case there are any problems.

We should be able to start some of the prep work at the beginning of December. Then start the major work after Christmas.
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

MQT3001 wrote:
DT&I wrote:Well hopefully sometime this winter but with Hurricane Sandy delaying everything we're gonna have to play catch up.
Our crews are scheduled to wrap up double-tracking work up to St. Joseph by the end of November, likely by Thanksgiving. They're not doing work per se, but are standing by during the cut-in in case there are any problems.

We should be able to start some of the prep work at the beginning of December. Then start the major work after Christmas.
Works for us, the third track is planned to have CPL's guarding turnouts and crossovers and be concrete ties with a track speed of 45 MPH.
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:
MQT3001 wrote:
DT&I wrote:Well hopefully sometime this winter but with Hurricane Sandy delaying everything we're gonna have to play catch up.
Our crews are scheduled to wrap up double-tracking work up to St. Joseph by the end of November, likely by Thanksgiving. They're not doing work per se, but are standing by during the cut-in in case there are any problems.

We should be able to start some of the prep work at the beginning of December. Then start the major work after Christmas.
Works for us, the third track is planned to have CPL's guarding turnouts and crossovers and be concrete ties with a track speed of 45 MPH.
Ballast will be provided from the company supply, courtesy of Lafarge in Alpena. Turns out they dislike the stuff we use for ballast, so we give them a discounted shipping rate and we get the stone. We'll start shipping that soon, do ou have a place to put it in Stanley?
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

You can put it in Corduroy St. Yard where there is room. Stanley is pack with PC and TSCR equipment currently.
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:You can put it in Corduroy St. Yard where there is room. Stanley is pack with PC and TSCR equipment currently.
And MQT road trains!

I will let you know when those trains are on the way. Stone season is ending at the end of the week for the most part, that'll free up a couple 60-car trainsets that could be used to store the stuff in addition to hauling the stuff.
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

L321 can always pick some extra stone up from Cecil if we order some, we always have SD70's, SD70MAC's, and ES44AC's on that local anyways as it picks up about 35- 45 loads every two days.
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:L321 can always pick some extra stone up from Cecil if we order some, we always have SD70's, SD70MAC's, and ES44AC's on that local anyways as it picks up about 35- 45 loads every two days.
Nah, Lafarge should have it covered.
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

We have an Ex-IC SD70 and Ex-IC SD40-2 up there that will pick a rail train up once you start making the payments, we need to be sure we have money to pay for this before it happens, Q222's counterpart(whatever that is, I can't think of it off hand) or a TSCR/AW intermodal will pick those two up and take them to Pittsburgh where we will get brand new rail from Carnagie Steel there. They will come back as K000. K000 will run both ways and make many trips to pick up however much rail is needed for the project. K001 will come off the CSX in Columbus and have ties and spikes and will also be tied down in Corduroy St. Yard. K002 will run from North Baltimore Yard to Corduroy St. Yard and have fully assembled CPL's on DTTX 89 Ft. flats and will run with two U23B's(Ex-GR&P). And MQT will provide the stone.

Starting January 2nd, 2013, TSCR crews will begin clearing away brush and trees along the ROW to make way for a 3rd track. This hopefully being done by the end of the month will provide us time to get a ballast train up there to dump new ballast by February 1st. Once that is done, preferably by February 20th, we can procede to get work crews up there to start laying ties and rails. Last by March 31st we hope to get signals, signs, and crossings back up and reopen track 1. Track 1 will be closed for the duration of the construction so equipment can be stored and used to complete the project. All trains will use the western half or track 2 until construction is complete.
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:We have an Ex-IC SD70 and Ex-IC SD40-2 up there that will pick a rail train up once you start making the payments, we need to be sure we have money to pay for this before it happens, Q222's counterpart(whatever that is, I can't think of it off hand) or a TSCR/AW intermodal will pick those two up and take them to Pittsburgh where we will get brand new rail from Carnagie Steel there. They will come back as K000. K000 will run both ways and make many trips to pick up however much rail is needed for the project. K001 will come off the CSX in Columbus and have ties and spikes and will also be tied down in Corduroy St. Yard. K002 will run from North Baltimore Yard to Corduroy St. Yard and have fully assembled CPL's on DTTX 89 Ft. flats and will run with two U23B's(Ex-GR&P). And MQT will provide the stone.

Starting January 2nd, 2013, TSCR crews will begin clearing away brush and trees along the ROW to make way for a 3rd track. This hopefully being done by the end of the month will provide us time to get a ballast train up there to dump new ballast by February 1st. Once that is done, preferably by February 20th, we can procede to get work crews up there to start laying ties and rails. Last by March 31st we hope to get signals, signs, and crossings back up and reopen track 1. Track 1 will be closed for the duration of the construction so equipment can be stored and used to complete the project. All trains will use the western half or track 2 until construction is complete.
The payment will be faxed in the morning. MQT can provide crews and machinery also...they've been doing this sort of stuff since March :lol:
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

Ok send the payments to this number: 419-009-7583. Our department of relations(Not to be confused with our department of public relations) will get it taken care of. Also we have been doing this all summer in Central Ohio with PC too but more equipment means less time to complete so you are welcome to supply them.
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:Ok send the payments to this number: 419-009-7583. Our department of relations(Not to be confused with our department of public relations) will get it taken care of. Also we have been doing this all summer in Central Ohio with PC too but more equipment means less time to complete so you are welcome to supply them.
Okedokee. The equipment will come in the form of two trains, and will be parked on a siding just north of the MI/OH border. Probably leaving the Benton Harbor yard tomorrow, and crew locomotive availability permit.
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

im making an interactive map of the TSCR so you can see the trackage in the Toledo area.
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:im making an interactive map of the TSCR so you can see the trackage in the Toledo area.
yippie!

Looks like a crew for the first train will be called at 9:00 EDT tomorrow. Who knows when the next one will be called...we've got to find locomotives for it first :lol:
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

Its not finished(not even close) but Toledo is so check that out.
https://maps.google.com/maps/ms?msid=20 ... ,10.777588
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:Its not finished(not even close) but Toledo is so check that out.
https://maps.google.com/maps/ms?msid=20 ... ,10.777588
Who owns the real-life CSX between your end-of-track and the MI/OH border?
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

MQT3001 wrote:
DT&I wrote:Its not finished(not even close) but Toledo is so check that out.
https://maps.google.com/maps/ms?msid=20 ... ,10.777588
Who owns the real-life CSX between your end-of-track and the MI/OH border?
The City of Toledo but Im sure they'd let you buy it.
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:
MQT3001 wrote:
DT&I wrote:Its not finished(not even close) but Toledo is so check that out.
https://maps.google.com/maps/ms?msid=20 ... ,10.777588
Who owns the real-life CSX between your end-of-track and the MI/OH border?
The City of Toledo but Im sure they'd let you buy it.
You buy it. We'd prefer not to own only a little bit of track in Ohio because it's another state to deal with legally :roll:

It's the line north and then takes the right....
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

User avatar
DT&I
Commodore Perry
Posts: 2973
Joined: Wed Jun 29, 2011 4:26 pm

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by DT&I »

The one out of Lang? The DTSL is owned by the TSCR to Detroit but the CSX line in real life next to the AA yard in between the end of the TBR and the MI/OH border is the city of Toledo.
I'm just here to put in time claims and complain

User avatar
Saturnalia
Authority on Cat
Posts: 15393
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: TO ALL RAILROADS THAT USE THE TBR(TSCR)

Unread post by Saturnalia »

DT&I wrote:The one out of Lang? The DTSL is owned by the TSCR to Detroit but the CSX line in real life next to the AA yard in between the end of the TBR and the MI/OH border is the city of Toledo.
3rd set of tracks west of Lake Erie. To the east of the AA.
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

Post Reply