Cincinnati, Batavia and Eastern - CBE

Sub forum for Paper Railroads
chapmaja
Railroadfan...fan
Posts: 1648
Joined: Sat Nov 22, 2008 2:02 pm

Cincinnati, Batavia and Eastern - CBE

Unread post by chapmaja »

GLOR will also be spinning off their Peavine Subdivision to a new wholy owned subsidiary company, the Cincinnati, Batavia and Eastern Railroad. CBE will operate from Clare Yard, including the transload facility which they will operate for NS, to Otway, Oh. The line from Otway east to Portsmouth will remain in place with a trail built alongside the tracks as part of the CNOTP sale to NS. The tracks will remain out of service at this time, but will remain in place for future potential use.

CBE will operate via trackage rights to interchanges with GLOR, CSX and NS in Cincinnati. Two units will be kept in Clare Yard for the transload, 2 will stay in Batavia for Purina, and the rest will work across the railroad including the interchange traffic.

CBE #7 MP15AC
CBE #12 MP15AC
CBE #4030 SD40-2
CBE #4035 SD40-3
CBE #4501 SD45T-2
CBE #4504 SD45R
CBE #1590 GP15M-3
CBE #1591 GP15M-3

All locomotives on the line will retain their GLOR number and paint scheme, however the units will be relettered for the CBE.

Purina is expect to open their facility early in 2025, and the work to connect the in plant rail network to the Peavine Subdivision is ongoing.

chapmaja
Railroadfan...fan
Posts: 1648
Joined: Sat Nov 22, 2008 2:02 pm

Re: Cincinnati, Batavia and Eastern - CBE

Unread post by chapmaja »

The tracks to Purina are nearly complete. All tracks within the Purina plant have been completed, and the connection to the mainline is nearing completion as well.

The operational plan for the CBE will be as follows.

PEA-1 will operate from Newton Yard to Clare Yard, bringing all traffic from the east end of the railroad to Clare Yard. PEA-1 will also switch the transload facility in Clare Yard.
The crew will also be responsible for breaking down trains from the east end to the various interchange partners and breaking down inbound traffic for distribution to the east end customers.

PEA-2 will operate from Clare Yard to the railroads interchanges with the GLOR, CSX and NS in Cincinnati. In addition, PEA-2 will assist PEA-1 in breaking down trains from the east end to the various interchange partners and breaking down inbound traffic.

PEA-3 will operate from Newton Yard to the eastern end of the line, servicing customers except those served by PEA-4 or PEA-5.

PEA-4 will be the Batavia Yard Switcher / Local. They will provide service to Purina and other customers surrounding Batavia.

PEA-5 will be the Hanson's Stone Trains, running from the quarry to the transload facility.

The current plan for locomotive allocation will be as follows.

PEA-1 and PEA-2 will generally operate with with #'s 4030, 4035, 1590, and 1591 split between the two operations.

PEA-3 will operate with 4501 and 4504 operating the east end of the line.

PEA-4 will operate with the endcab switchers 7 and 12.

PEA-5 will operate with 4501 and 4504 or with additional power the CBE may acquire from the GLOR, which is still to be determined at this time.