Signals were out and a Maintainer was working on the signals at Vernon today. Also a track gang was working on the south end of Durand Yard today. I also believe the Eastbound Absolute signals for Durand were out.
There was a long string of loaded Coal Hoppers on the east side of the yard, probably from 764.
This Eastbound got permission to pass signal displaying stop at Durand around 12:45pm today. Assuming its 396. CN 2555, CN 5624, BCOL 4644

370, CN 2516, BCOL 4625 got permisson to pass stop signals at Vernon and Durand around 3pm. They were to meet 393 at Flint.

