D706-17 @ 14:06 eastward reported by DD mp CH126.3 with 192 axles. CSX engines #5419 + #5307 & 45 cars. He has 15 cars to set off in Lansing.
You might have sharper hearing but I am curious. Is it #5419 leading? I know that one has been through lately but as has #5459 which was paired with #5307 when they last went as D705 on Monday. I thought to have heard #5459 on radio just after listening to CH126.3 read off but not too sure.
Yeppers, you are correct, it's the #5459 leading. Thank you I've gone back & edited.
They brought one BNSF covered hopper to Vanden Bosch feed elevator, and two centerbeams to Zeeland Lumber. I may have missed one, but these are the first lumber loads I’ve seen at this normally busy customer in about 2 months.
D801-17 @ 20:06 copied his EC1 to depart West Olive mp CGP 1.0 mp with BNSF engine #8538 & CSX engines #3440 + #3167 & 130 empty coal cars & rear dpu BNSF #9764. He'll go into Wells mp CG41.4 to set off the empty coal train & then cut away the CSX power to take to the east end of Grand Jct mp CG54 for N800-15 that's tied down there.
Amtrak P370-17 @ 22:05:55 eastward Bangor’s Division St crossing mp CG60.93 with IDTX engine #4619 & 3 SuperLiners (2 passengers Off at the station mp CG60.5)
D801-17 @ 23:12 on 11/17 westward reported by the DD mp CG44.2 with 12 axles & 132 feet long. CSX engines #3440 + #3167 lite power going to the east end of Grand Jct siding mp CG54.
D803-17 @ 06:32 eastward reported by the DD mp CG44.2 with 544 axles & 6,979 feet long. BNSF engine #6430 & CSX engines #3167 + #3440 & 130 loaded coal cars & rear dpu BNSF #6433 This was N800-15 that was tied down in Grand Jct mp CG54. He will wait inside Wells for Amtrak P371 to pass by.
After dropping off the loaded coal train in West Olive, he will return as light power to Holland to pick up loaded coal cars (about a dozen) that had arrived recently on Q326 & take those to West Olive, then build an empty coal train.
Amtrak P371-18 @ 06:37 westward reported by the DD mp CG19.1 with 16 axles & 308 feet long. IDTX engine #4619 & 3 SuperLiners.
Q327-18 @ 06:52 Grand Rapids job briefing with the RN Dispatcher: BNSF engines #5063 + #7571 & 142 cars (49 loaded + 93 empty). He's ready to depart.