Railroadfan.com Photo Gallery

Upload your favorite railroad photos

Last additions
3160e__28wrk295B136255D.JPG
C&O Derailment - Howell, 1976 - Bob M PhotoHow did it happen? Here is the entire story, because I was there for it. The date was January 12, 1976, at 5:30am Train 156 from Grand Rapids to Flint, as it crossed the diamond at Ann Pere encountered a broken rail just east of the diamond. The last five cars in the train and the caboose derailed, but all but the caboose, which when down into the ravine, remained upright.

What was ironic about this, the conductor, who back in the "old days" had their own assigned caboose, that he took with him on whatever job he was on, was on his first trip to Flint with his cab 3160, after many years on the Grand Rapids to Toledo runs.

On the date of the incident, six inches of new snow had fallen, and within 24 hours after, another foot had fallen. Combined with this and other factors, the caboose was not re-railed and brought up from the ravine until March 17, 1976 after laying there for two months and five days.
SaturnaliaApr 06, 2017
3160_d__28wrk295B136265D.JPG
C&O Derailment - Howell, 1976 - Bob M PhotoHow did it happen? Here is the entire story, because I was there for it. The date was January 12, 1976, at 5:30am Train 156 from Grand Rapids to Flint, as it crossed the diamond at Ann Pere encountered a broken rail just east of the diamond. The last five cars in the train and the caboose derailed, but all but the caboose, which when down into the ravine, remained upright.

What was ironic about this, the conductor, who back in the "old days" had their own assigned caboose, that he took with him on whatever job he was on, was on his first trip to Flint with his cab 3160, after many years on the Grand Rapids to Toledo runs.

On the date of the incident, six inches of new snow had fallen, and within 24 hours after, another foot had fallen. Combined with this and other factors, the caboose was not re-railed and brought up from the ravine until March 17, 1976 after laying there for two months and five days.
SaturnaliaApr 06, 2017
IMG_4295_281024x68329.jpg
M.D.BentleyApr 04, 2017
IMG_4298_281024x68329.jpg
M.D.BentleyApr 04, 2017
IMG_4294_281024x68329.jpg
M.D.BentleyApr 04, 2017
IMG_4289_281024x68329.jpg
M.D.BentleyApr 04, 2017
9~0.JPG
Muddin' 3 (unfocused)w nealMar 30, 2017
7~0.JPG
Xing restainedw nealMar 30, 2017
6~2.JPG
Muddin' 2w nealMar 30, 2017
5~1.JPG
Muddin'w nealMar 30, 2017
IMG_20150923_120341375_HDR.jpg
LSI ore dockMMRR-24Mar 27, 2017
_20150606_111707.JPG
1225MMRR-24Mar 27, 2017
20170325_130613.jpg
NS toledoMMRR-24Mar 27, 2017
shows.png
w nealMar 27, 2017
Buzzi_101.jpg
GLC 27 March 2017GLC 399-397 are seen spotting 8 covered hoppers at the Elmira Cement Terminal.
These are the first loads delivered to Elmira since it stopped geting cement by rails few years back.
KCMar 27, 2017
35411 files on 2361 page(s) 29